
On Tuesday evening, the Kirkland City Council approved a letter to the Sound Transit Board offering a compromise to resolve the impasse over transit on the Cross-Kirkland Corridor (CKC). The letter (significantly revised from the draft Zach reported on Saturday) seeks an investment in trail access from Kirkland to the Wilburton Link Station and Kingsgate BRT station. These trails would be designed to accommodate transit, carefully signaling the integration of transit and other uses on the corridor. At the same time, ST3 would fund planning and development for high-capacity transit on the corridor, leading to a record of decision for transit in the next regional package.
The “Kirkland Compromise” includes:
- A Regional Trail connection from Sound Transit’s Totem Lake terminus to Sound Transit’s Wilburton Station in Bellevue along the CKC and ERC. This would be a fully developed permanent trail built to the specifications of the Cross-Kirkland Corridor Master Plan in Kirkland and King County’s ERC Regional Trail Master Plan in Bellevue.
- Trail planning aligned with transit planning to clearly define a future transit envelope in the CKC and ERC in Bellevue. Planning the trail and transit together ensure the trail would not be disrupted in the future.
- Design money allocated for transit design on the CKC/ERC to achieve a record of decision.
- BRT on I-405 to include an inline station at NE 85th along with transit service directly connecting downtown Kirkland to Redmond along NE 85th in exclusive lanes.