
Central Link light rail will not operate between Westlake and SODO stations all day Saturday and Sunday, June 12-13, due to engineering work in the Downtown Seattle Transit Tunnel.
According to Bruce Gray at Sound Transit, Metro/Sound Transit are updating the fire/life/safety system software and running it through comprehensive testing as requested by Seattle Fire Department. SoundTransit is also raising the OCS wires by about a foot from Stadium to Royal Brougham. They were lowered during the WSDOT work on their new ramp.
Sound Transit will run a free bus shuttle between SODO Station and Westlake all weekend.
The shuttle will run every 5-7 minutes during normal Link hours.
Additionally, all King County Metro and ST Express buses that normally operate in the tunnel will also be rerouted to surface streets.
Link light rail will operate every 10 minutes between SeaTac/Airport and SODO stations on Saturday, June 12 from 5 a.m. to 1 a.m. and every 10 minutes on Sunday, June 13, from 6 a.m. to midnight.