Kirkland’s RapidRide should connect to Redmond

Frequent Transit Network in Kirkland in 2024, after the North Eastside Restructure and I-405 BRT, but before RapidRide

In March 2020, Metro will implement a restructure of service in the North Eastside. Most attention will focus on the truncation of Metro 255 to connect with Link at UW station. Another key element of the improved Metro network is route 250. This new route connects downtown Bellevue to Kirkland and runs through to Redmond. It splices together the most productive parts of several current routes (234, 235, 248) for a more frequent connection serving three of the Eastside’s major downtown centers.

The route is likely to be successful. It is, however, a step away from the Long-Range Plan (LRP) Metro adopted in 2017. In developing the North Eastside restructure, Metro assessed that this routing has more value than the Rapid Ride routing assumed for 2025. Sometime this year, Metro will kick off planning this year for a 2025 RapidRide route in this market. As they do so, Metro should reflect the learning of the North Eastside process, adopting route 250 as the preferred option for service north of Bellevue, with Kirkland-Redmond service substituted for the less useful Kirkland-Totem Lake segment. Continue reading “Kirkland’s RapidRide should connect to Redmond”