East Link restructure: Bothell, Duvall, Kirkland, Redmond, Woodinville

Map showing proposed changes to specific routes in the Kenmore, Bothell, Woodinville, Duvall, Kirkland, Redmond areas to connect with Link light rail
Map of proposed bus route changes in the north Eastside area

Although the north Eastside’s primary regional transit corridors are I-405 and SR 522, which have their own Stride bus rapid transit projects in the works, Metro identified several opportunities to optimize service in this area when the Link 2 Line to Redmond Technology (Overlake) opens in 2023 and extends to downtown Redmond in 2024.

Woodinville, Duvall, and Redmond Ridge will be one bus away all-day from Link. Peak-only service to Seattle will make stops in South Lake Union and no longer travel on local streets in Kingsgate. Peak-only service to Bellevue and Overlake is replaced by all-day service to Link.

That’s the gist of Metro’s proposal in this part of the Eastside. You can reference a map of current Eastside service with the proposal map above. Here are the details:

Continue reading “East Link restructure: Bothell, Duvall, Kirkland, Redmond, Woodinville”