Over the past few months, the Wilson Transition Committee has met with thousands of Seattlities to better understand what the residents of Seattle want to see from the Wilson administration. The full report outlines recommendations in eight areas: Housing Affordability & Community Needs, Economic Development & Workers’ Rights, Transportation & Environment, Arts, Culture, & Creative Economy, Civic Narrative & Major Initiatives, Standing Up for Our Values, Public Safety, Parks, & Community Wellbeing, and Student & Youth Advisors.

While these different areas are intertwined, it’s worth highlighting the transit, mobility, and public access recommendations:

  • Expand citywide bus priority lanes.
  • Create integrated mobility hubs with user amenities & safe waiting areas, especially near light rail & bus transfer points. 
  • Align transit investments with equity goals, ensuring access across neighborhoods, regardless of car ownership or income. 
  • Increase 24-hour bus service
  • Expand North-South & East-West connections, including Rainier Valley to Tukwila/Georgetown & Golden Gardens to UW. 

The report also mentions a few early wins for each category. For transit, these include: 

  • Paint bus lanes on Denny. 
  • Extend Seattle Housing Authority ORCA passes & increase Orca pass programs for nonprofits.

Along with the transit recommendations, the Transition Team has a few recommendations for Vision Zero, Street Safety, & Active Transportation:

  • Set 5-year incremental targets for the goals in the Seattle Transportation Plan (Vision Zero, climate, & Vehicle Miles Travelled reduction), & direct SDOT to use them to determine project selection, project budgeting, design, & delivery schedules.
  • Prioritize pedestrian, cyclist, & micro-mobility safety through protected lanes, raised intersections, & traffic diverters.
  • Ensure equitable distribution of infrastructure upgrades to historically underserved areas, start major Vision Zero projects for SE Seattle including transforming Rainier Ave S & MLK Jr Way S.
  • Implement & strengthen neighborhood-level traffic calming programs, including School Streets, Home Zones, traffic diverters, & curb bulb-outs.

These recommendations are a great start for making Seattle a safer, greener, and more efficient city. Unlike their peers in some other cities, Seattle’s Mayor does not control the city’s buses or trains. King County Metro operates the local bus service and Sound Transit, a regional agency, operates the light rail, commuter rail, and express buses. Outside of a seat on Sound Transit’s Board, Wilson cannot directly control either agency.

There are a few ways the Mayor can directly influence transit in Seattle. The first is through transit infrastructure implemented by the Seattle Department of Transportation (SDOT). This can include bus lanes, signal priority, and amenities near transit centers. Another key way Mayor Wilson can improve transit is by shaping the Seattle Transit Measure’s successor. Per the recommendations, Seattlities want better night-owl service and improved connections east-west connections. These services can be improved with funding from the next STM.

In addition to transit infrastructure and policy, Mayor Wilson can improve transit by reducing the number of cars on Seattle’s roads. Projects that improve pedestrian, cyclist, & micro-mobility infrastructure encourage more people to get out of their cars for some (or all) trips. Fewer cars on the roads will reduce traffic related delays for many bus routes and lead to more people taking transit.

This is an open thread.

146 Replies to “Friday Roundtable: Wilson Transition Committee Recommendations”

  1. Could a First Hill Station be added to the 1 Line? I would say somewhere between Bellevue and Minor avenues. Sound Transit did try to add a First Hill Station to the original Central Link but failed to, so can it be added as a possible infill station?

    1. Two infill stations can also be added near Montlake and Volunteer Park, that way buses that end near Volunteer Park (I’m talking about the 10/12) can end here as a regional hub, and a Montlake station can be located near Roanoke St.

      1. “No.

        Again, way too deep, way too steep.”

        Tell that to ST, let’s see how pretty their face is when they find out that they could have served a great area (First Hill) and Metro has to retain their express buses to First Hill and waste resources when they could have added a First Hill station…

        But you just couldn’t… THEN YOU FIND ANOTHER WAY!!!

        YOU HAVE TO FIND EVERY WAY TO ADD A STATION IN FIRST HILL, EVERY EFFORT!!! EVERY EVERY EVERY EVERY EVERY EVERY EVERY EVERY EVERY EVERY EVERY EVERY EFFORT!!!

      2. Of course they can, just like other countries make seemingly-extraordinary changes to their subway lines. It would be extremely expensive to dig down, break the watertight seal and keep the water out until it can be resealed, and build an underground station. It’s implausible ST could raise enough money for that, or that voters would approve spending so much on an infill station. And you’d have to check whether the track still goes as far into First Hill as was planned for the station. It may cross Boren further north now, so that it would be less in the center of the First Hill destinations and density.

      3. Scooby, you’re an idealistic kid, and that’s “charming”. You also don’t understand 60% of the regurgitated BS you spout.

      4. Is that supposed to be a metaphor? Look, I know we might disagree with things but it’s always important to stay respectful. But it’s okay, I have my transit views and you have yours. I was just trying to say that First Hill should be a first priority for Sound Transit speaking of the issues. The infill stations I suggested would be fun but I’m kind of exaggerating. Adding infill stations in tunnels aren’t impossible but will just be a very steep pathway to one.

      5. “I was just trying to say that First Hill should be a first priority for Sound Transit speaking of the issues.”

        It should be but we’ve been trying for a decade and a half and it’s an uphill battle.

        The reason ST dropped First Hill station in ST2 is it was afraid the unstable soils it discovered might lead to major cost overruns. This was after ST’s cost meltdown in 2000 and deferring the Ship Canal crossing for the same reason; it was afraid the Ship Canal crossing might become so expensive it would jeapordize opening any kind of Link at all. Deleting First Hill station happened around the same time as the Ship Canal Crossing was just being revived, as ST had gotten to a more stable financial position and determined another Ship Canal routing would avoid the previous problems. ST wasn’t as worried about First Hill, but it didn’t want anything more that risky.

        This may seem quaint in light of WS/BLE’s cost overruns and ST’s determination to add costly options, but that’s how the mood of the agency and the governments has changed since the early 2010s.

      6. The way to get to First Hill is to have a shallower New Westlake box for the Automated Light Metro that the Blog Consensus supports for BLE just north of Pine under Sixth. Continue south under Sixth to another small station under Sixth between University and Seneca, turn sharply east at its southern end and then turn back southeast under Boren or Minor to two more stations. One would be at Madison and the other between Harborview and the new Yesler development.

        How the community gets there is that the part of BLE that ST3 funds would lie between Westlake and Smith Cove, with five stations, that shallower “New Westlake”, Denny Way, “SLU”, “Uptown”, and Smith Cove. A stub to the south would project out from the New Westlake station box.

        Then, when Seattle can afford it on its own without ST screwing up the engineering, build the section above.

        Next, again when funds can be accumulated, extend on to Ballard with a westside crossing near the locks so that the tunnel (or elevated structure) can end up pointing east toward the U District.

        Fourth, come out of the ground south of Yesler and run elevated down Rainier to Judkins Park and Mount Baker, with a couple of “infill” stations.

        Finally, go east through Frelard, Fremont by the Troll, and Wallingford to U District.

        Build The Snake!

      7. first hill is just too high and any station would have to be way too deep (relative to the height of the ground).

        it’s why the original midtown station was basically shelved. sound transit keeps trying to push it further west 4th/5th because it is a lot lower and literally like half a billion cheaper to build the mined station on lower ground.

        the pioneer square 2 station is even cheaper.

        honestly the location of midtown station in st3 was at foolish in the first place.

      8. “it’s why the original midtown station was basically shelved. sound transit keeps trying to push it further west 4th/5th because it is a lot lower and literally like half a billion cheaper to build the mined station on lower ground.”

        ST pushed it south to leverage the site of the unused King County Administration building, to build the station and replace the building together. It’s not further west.

      9. first hill is just too high and any station would have to be way too deep (relative to the height of the ground).

        We have plenty of very deep stations that perform really well, including nearby Capitol Hill Station. At some point it probably makes sense to rethink the station configuration. Maybe go with just elevators. Beacon Hill has this setup but you would have higher capacity elevators (like Madrid). Either way it would be worth it, given the importance of First Hill.

        honestly the location of midtown station in st3 was at foolish in the first place.

        Yes. If you are going to add a new subway line in a downtown area you should be maximizing coverage. This means a station at First Hill (instead of one very close to the others). Otherwise there is not much point in the tunnel in the first place. This is just basic stuff (subway building 101).

      10. The thing that drives First Hill ridership is the hospitals, clinics, highrise (not midrise) residential towers, and high percent of elderly residents (who are less likely to drive on average) — not the depth of the station.

        Like everywhere else, Link’s wide stop spacing and underground stations make it unattractive for two nearby adjacent stations, but make it increasingly attractive for longer trips. If I’m going from Westlake to the Symphony area or library, I don’t take Link; I take a more frequent bus or walk. If I’m going from Westlake to Pioneer Square, I might take Link. If I’m going from Westlake to Intl Dist or beyond, I do take Link.

        First Hill has the complication of steep hills. So people would take Westlake to First Hill to avoid the hill.

        And Capitol Hill station is so far away from the adjacent UW, U-District, or Westlake stations that taking Link even one station is favorable for those trips. I’ve tried walking over the years, and it takes 1 1/2 hours from Capitol Hill station to U-District station, or 40 minutes from Capitol Hill station to Westlake station. A bus ride takes 15-20 minutes for either of these. So a 3-minute train ride is like night and day compared to that.

      11. WL, read what I wrote instead of just waving it away. I said that you start with a shallower New Westlake, ideally with a track level just one and a half stories below The Spine Tunnel’s box at Sixth. Sixth is east of the existing Westlake box, and the supports are much less dense for the far lighter c-n-c tunnel.

        Immediately south of Pine the tunnel would start to rise instead of plunging as in the DSTT2 plan. Sixth Avenue also rises, so that even with a modest mezzanine between University and Seneca the track level could be twenty or thirty feet above the MEZZANINE level at DSTT Westlake. That’s essentially street level at Pine.

        Sure, there is still another one hundred feet of rise to Madison and Boren, so of course a station there would be deeper than this “Midtown” station at Sixth and University/Seneca. If that’s too deep, put the First Hill station Madison and Terry. That has the advantage that Terry is a non-arterial, so decking it would be much simpler and less intrusive then decking Boren.

        South of that station the track could rise a bit more before the Yesler/Harborview station.

        This is not impossible precisely because it diagonals up the hill.

      12. “the location of midtown station in st3 was at foolish in the first place.”

        It was to serve Madison Street, the library, and by extension RapidRide G. That was left out of the original DSTT and some see that as a mistake. The library is an important destination that’s not well served by Symphony or Pioneer Square stations. The Chicago L has an actual station called “Library”. If the original tunnel had had a Madison station, Symphony could have been a bit further north to be closer to Pike Place Market.

        The depth doesn’t matter: what matters is what’s there. What’s there is the library and a major east-west corridor.

    2. No.

      The grade and curves of the track are not such that you could add a station. Plus, it would be 200 feet deep.

      And you would have to shut the main trunk down for years.

      1. Indeed. Sound Transit’s bad decisions will continue to hold back Seattle for generations to come.

        That is why we must get it better with the next lines.

      2. I fail to see how this was a bad decision. The line would have been prohibitively costly had fhs been retained.

      3. Say no to Maple Leaf. That place is residential and can’t possibly hold HCT rail.

      4. “Indeed. Sound Transit’s bad decisions will continue to hold back Seattle for generations to come.”

        MLK is probably the best example out there, even better than First Hill…

        THAT MEANS YOU, D M!!!!!!!!!!!!!!!!!!!!!!!!!! YOU YOU YOU YOU YOU!!!!!!!!!!!!!!!!!!!!!!!

        NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO!!!!!!!!! WE ARE NOT MAKING THESE MISTAKES AGAIN!!!!!!!!!!

      5. @D M, I’m not just talking about First Hill. I’m also talking about all the other stations that should’ve been there but aren’t. There’s just one station between Westlake and UW Med Center, while it’s going under some of the densest and most destination-packed neighborhoods of Seattle!

        And that’s not the only glaring bad decision; just the most obvious and hardest to work around.

      6. @William C.

        I totally agree, infill stations are hard to add but sometimes you just like to muse about them and how great they would be. Adding Pinehurst Station has already caused trouble… Now imagine adding a tunnel infill station! Musing them is fun but hard when done, another mistake I think ST has also done is bypassing Southcenter on Central Link… Of course they mused it but would have been better as a reality… I have to transfer to the F Line at Tukwila International Blvd!

      7. The line would have been prohibitively costly had fhs been retained.

        “Prohibitively costly” compared to what? We have trains to Lynnwood — and are planning on trains to Everett — and yet we couldn’t afford a station at First Hill? Sorry, but that is absurd.

        Consider Northgate Station. It is a very good station. But imagine if they only built a line from Roosevelt to downtown. As William mentioned, imagine if they had a lot more stations as well (not just First Hill). You know, like a normal metro.

        You would still have the 41 as well as all those express buses from Snohomish County. Yeah, that would be unfortunate. But you would end up with more riders. You would have a lot more riders per mile. This is important because it is easier to maintain. You would also have a much bigger increase in overall time savings. Yes, some of the riders from Northgate (and north end places) would have trips that are a bit slower, but lots more people would save a lot more time.

        Not only that, but eventually, as we spent more money (like, say, ST3) the lines would extend farther north. You eventually would have Northgate Station and riders there would have a one-seat ride to First Hill (and other stations). Same with those in Shoreline as well as Snohomish County. In the long term, it would be much, much better.

        But instead we were focused on quantity, not quality. They were obsessed with getting to Everett so they short changed the metro inside the urban core. This was bad for just about everyone. If Link served First Hill then even riders in Everett would be better off. It really doesn’t take long from Everett to get to Capitol Hill. Where it takes a while is between Capitol Hill and First Hill. Or U-District Station and Campus Parkway. Or a bunch of other places.

      8. I totally agree, infill stations are hard to add but sometimes you just like to muse about them and how great they would be.

        Yeah, sure. But by and large it is just too expensive unless you planned to add it later anyway.

        Adding Pinehurst Station has already caused trouble…

        Yes, but only because they decided to add the station later. Otherwise it is quite similar to every other station north of Northgate. Put it this way. Imagine Pinehurst Station was part of Lynnwood Link but 148th was not. People would complain about 148th Station and the overall low ridership at similar stations (like 185th). Whatever. It is still a good idea to add a station there (or at 155th). Either way the big problem was waiting. Pinehurst Station should have been built when they built Lynnwood Link (just like Graham Street Station). But better late than never.

        Now imagine adding a tunnel infill station! Musing them is fun but hard

        Yes, it is extremely expensive.

        I think ST has also done is bypassing Southcenter

        Agreed. I think most everyone agrees. But if memory serves there was political pushback against it. There was also the obsession with distance (i. e. “The Spine”).

      9. “Adding Pinehurst Station has already caused trouble”

        ST never explained to the public how many closures and single-trackings would be required to add East Link or Pinehurst station, so it caught us by surprise. We thought the Connect 2020 closure in January 2020 was all that would be needed to tie East Link in, but instead there have been dozens of closures and single-trackings over the past year or two. And Pinehurst Station has had a surprisingly large number too, even though the line was built with a shell for a future station that could supposedly be added with minimum disruption to active service.

        Now that we know these, we can anticipate years of closures and single-trackings for each of Graham station, BAR station, and the Ballard Interlining alternative at Symphony station.

      10. Scooby doo guy,

        You need to chill out. Being antagonistic is a fast track to being ignored.

        I feel like the discussion around past decisions ST made here is completely devoid of the context the agency was in the early 2000s. In the late nineties and early oughts the financial state of the agency was much, much more fraught. The project was at risk of getting entirely cancelled and FTA funding pulled or witheld. It’s kind of a miracle the thing got built at all. You can look at the MLK section as the gravest of errors and wonder why the did it that way, but the answer boils down to cost. If you want more information I highly recommend reading the book “Back on Track” to get a sense of the decision making and situations of that era. SPL has a copy.

      11. The Pinehurst closures don’t make any sense to me. TriMet completely tore down and rebuilt the 82nd Ave station with only two brief closures. One of those closures was to build a completely new temporary station to serve as a substitute while they worked on the permanent one.

      12. Glenn

        Pinehurst is a much more substantial project than the 85th station rebuild. From my understanding most of the single tracking occurred when power needed to be shut down to work on the roof structure next to the overhead wire.

      13. “The Pinehurst closures don’t make any sense to me.”

        Bad construction planning is probably the problem. The construction program dates from 2018.

      14. Pinehurst is a much more substantial project than the 85th station rebuild.

        Yeah, but as Mike pointed out, this was the plan. Just to back up here, they discussed three options in one of the Sound Transit meetings:

        1) Build Pinehurst Station with the rest of Lynnwood Link. This was the cheapest option but it meant spending money sooner, rather than later. This might have delayed the opening of Lynnwood Link.

        2) Build Pinehurst Station entirely after everything else. This would have been the most disruptive.

        3) Build some of it now, but not all of it. This means spending less money now but very little disruptions once Lynnwood Link is operating. At least that is what they said. This is what the board eventually approved.

        It is worth pointing out that the people who wanted the station to be built as soon as possible were using the disruptions as an argument. They felt like convincing the board of the value of the station was a lost cause. Folks in other areas didn’t care so they didn’t care when it was built. But this was right after (or during?) the shutdowns on CID due to the work there. They wanted to emphasize to the board that if you build a station with Lynnwood Link (option 1) then you avoid those type of shutdowns. The staff happened to suggest option 3 which pretty much killed that argument (which is why the board went with it). The fact that we are having disruptions anyway just shows the lack of communication and competence. They should have gone with option 1 — it would have been better for everyone.

        The other funny thing about the meeting is that proponents of the first option had signs that read “Build 130th Station in 2023”. This was when Lynnwood Link was supposed to open. But at this very meeting the staff announced that Lynnwood Link wouldn’t be built until 2024. Thus we were left trying to change the numbers (or just living with signs that were clearly out of date).

      15. “The other funny thing about the meeting is that proponents of the first option had signs that read “Build 130th Station in 2023”. This was when Lynnwood Link was supposed to open.”

        I get the joke, but I mean Stadium and SODO stations were completed in 2006 but did not open until 2009.

      16. Pinehurst is a much more substantial project than the 85th station rebuild.

        Size of station wise, yes.

        Logistically speaking, no.

        The entire 82nd Ave station was rebuilt, including the stairs (right next to the power lines) and platform structures including the shelters. All equipment and materials had to be brought in on the MAX tracks themselves. So, every night they moved everything into place after end of service, and moved everything away before start of service, with some of the equipment stored on the pocket track at Hollywood station.

        Pinehurst has road access.

        Sure, overnight work when the trains aren’t running had its problems too, but TriMet figured out how to do it.

      17. “The Pinehurst closures don’t make any sense to me. TriMet completely tore down and rebuilt the 82nd Ave station with only two brief closures. One of those closures was to build a completely new temporary station to serve as a substitute while they worked on the permanent one.”

        It sounds like TriMet can do a European-style renovation.Maybe ST should hire TriMet as advisors.

      18. “I think ST has also done is bypassing Southcenter on Central Link”

        Tukwila Link was going to be surface on 154th/Southcenter Blvd and Tukwila Intl Blvd. But the City of Tukwila objected because it had just beautified Tukwila Intl Blvd and didn’t want it torn up again, and it didn’t want Link taking a corner of Southcenter’s property. So ST elevated it. And because it had to clear several highways between MLK and TIB without steep inclines, it elevated the whole thing. And the segment on Tukwila Intl Blvd was moved to the airport freeway.

      19. Tukwila Link was going to be surface on 154th/Southcenter Blvd and Tukwila Intl Blvd. But the City of Tukwila objected because it had just beautified Tukwila Intl Blvd and didn’t want it torn up again, and it didn’t want Link taking a corner of Southcenter’s property. So ST elevated it. And because it had to clear several highways between MLK and TIB without steep inclines, it elevated the whole thing. And the segment on Tukwila Intl Blvd was moved to the airport freeway.

        This gets back to the basic flaw with the Link process. Normally you focus on the most important piece first. This usually means the place where you get the most riders per mile. Then you expand. This does a couple things. You get the most benefit sooner. You also change the mindset of riders. When Link got to the UW, The Stranger quoted people saying “I can’t believe how fast it is from Capitol Hill to the UW?”

        My attitude was “Don’t you know how to read a map?”

        But they were used to walking, driving or riding a bike. They never measured the distance and realized it really isn’t that far. They never estimated the speed of a subway (which isn’t that fast) and realized that without big delays (traffic lights, stop signs, traffic) it would take very little time to go between stations. In other words, their perspective on mass transit had changed.

        As mass transit becomes more popular in one neighborhood it becomes more desirable in another. A community rejecting mass transit (too ugly, too disruptive, etc.) just becomes silly. Disruptive? Sure, but holy cow, think of all the riders! Of course some place like Southcenter wouldn’t have the same ridership but folks would realize what a valuable thing the trains are. They would want it in their neighborhood, not just their city.

        Unfortunately, Sound Transit took a different track. They approached this as a regional system, much like you would commuter rail or a freeway. The selling point was traffic. It was “Supertrain” all over again (https://www.youtube.com/watch?v=YDjy9uJUawU). Notice how the character talks about traffic and park and rides, not lots of people getting from one place to the other faster than driving, at noon. This Supertrain idea permeated Sound Transit. If you view the system as an alternative to traffic or a place to park and ride then there is no reason to have a station near your particular neighborhood. Far from it. You want it somewhere else — somewhere you can drive to.

        The inability to properly explain the benefits of a mass transit system led to every big mistake after that. Obviously the failure to properly estimate the cost of the system contributed a lot as well. They became gunshy. Heaven forbid they have yet another cost overrun in First Hill. So while some on the board suggested that the obvious fallback position was UW to Rainier Beach (since it was supposed to get the most ridership) others wanted to just run south. But the problems started before then, and they managed to screw up everything after that. Even the choice of light rail was based on this failing. The one good argument for light rail was that it allowed the buses and trains to share the transit tunnel. That’s nice, but it never was the long range plan. Given that, it would be quite reasonable to build just enough to reach a tipping point — where the buses can be kicked out but you have save enough service to improve things overall. Maybe that tipping point is U-District; maybe it is Northgate. Either way it makes sense to start with that, given that would also provide the original (standard) goal: building the most important piece first. Of course all of this would be OK and just water under the bridge if not for the terrible stop spacing. This is entirely due to the same problem. Sure, Seattle wanted those extra stations, but the suburbs didn’t. Since the raison d’être of Link is trains from Tacoma to Everett, those stations were skipped.

        The result is as you would expect. Ridership within the city will dominate, no matter how poorly they served it and how far out the line goes. The lack of stations inside the urban core means way too many people feel like it is necessary to drive. Despite one of the biggest investments in mass transit on the planet, it is quite likely overall transit ridership in the area peaked in 2019. Despite one of the largest modern rail lines in North America, people are extremely dependent on the bus, as folks try valiantly to make them just a little bit faster and more frequent. We’ve moved the needle, but we haven’t moved it much.

      20. Link was originally designed to go up 99 from BAR to Sea-Tac. Tukwila wanted Link to go up Interurban to Southcenter, then turn west to Sea-Tac. ST wanted a more streamlined route to Sea-Tac. The current routing is the compromise.

      21. “You also change the mindset of riders. When Link got to the UW, The Stranger quoted people saying “I can’t believe how fast it is from Capitol Hill to the UW?””

        I think it’s a great idea if we add maybe 5-6 stations between UW and Capitol Hill, right? Light rail should serve more stops!

      22. “They never measured the distance and realized it really isn’t that far.”

        It is far though. On the map it looks like Broadway is close to 5th and they’re adjacent neighborhoods. John Street looks close to the U-District. After all, it’s just four blocks 5th to 9th, plus the 7-block pie wedge between 9th and 10th, plus 3 blocks north to Denny, and 1 more block to John. So 15 blocks, it should take 15 minutes or 3/4 mile. But if you walk it, in 15 minutes you barely get to Bellevue Ave. No wonder so many people take a bus or Link that “short” distance.

        From the U-District to Capitol Hill, it looks like the University Bridge is hardly anything, and the Harvard Avenue segment is hardly anything, So I thought 20 minutes from Campus Parkway to the Broadway shopping district. But 20 minutes only got me to Roanoke Street.

        The first time I tried something like this was in high school when a friend and I walked from the top of Queen Anne to the U-District. I thought it would take less than an hour, but it took an hour and a half.

        And if you measure the distances of the first two (not Queen Anne), they do come out to two or three miles.

      23. “Seattle wanted those extra stations, but the suburbs didn’t.”

        I doubt even the Seattle city government wanted those stations, or did anything to try to get them. The representative Link alignment had one more station at Broadway & Roy. The Montlake alternative (the one eventually built) had no counterpart station. U-Link was deferred ca. 2000 with the former. When it was revived ca. 2005 with the latter, there was no look at revisiting the number of stations, in particular replacing that station with one at 15th & Thomas. It was just lost, and no other stations were proposed. The only ones I’ve seen advocating for stations at Bellevue Ave, 23rd, and 520 are you and some transit fans, never anybody at the city who would have clout with ST.

      24. “I think it’s a great idea if we add maybe 5-6 stations between UW and Capitol Hill, right? Light rail should serve more stops!”

        It’s not a “light rail” issue; a traditional heavy rail metro would have 5 stops too. A typical light rail wouldn’t even have so much tunneling in the first place; they’re 95+% surface, and it would have that many stops. The half-mile stop spacing is designed so that every point in between is within a quarter-mile walkshed of a station (5 minute walk).

        Link’s station spacing in Seattle outside downtown is 1-2 miles. That makes it a “limited stop” service (semi-express). That’s an advantage when going from Westlake to U-District or Westlake to Lynnwood, but a disadvantage if you’re going to the urban neighborhoods in between (like Bellevue Ave, 15th, or Montlake — Montlake isn’t much but it could be bigger). This makes Link unlike typical subways.

        It’s not about “serving everywhere” like outer Magnola or Covington. It’s about serving all the urban villages and having a continuous line of walksheds without gaps.

        If Link had all those stations, Westlake-UDistrict, instead of taking 8 minutes, would take something like 12 minutes. That’s compared to 25-30 minutes by bus, so it’s still twice as good.

        The ideal concept assumes a flat topography and evenly-distributed medium density retail/destinations. Seattle is more complicated with hills and uneven density and random physical barriers. Bellevue Ave and 15th Ave are typical medium-density neighborhoods that a European subway would definitely have a station at. 23rd Ave and 520 are single-family lower-density residential-only, so they strain that model.

        If you try to transplant that to Renton or Kent, you find that most of the half-mile points where stations would go are lower-density residential-only, strip malls with surface parking lots, in the middle of more highways or large streets, or don’t have a complete street grid with short pedestrian-friendly blocks. This is what hinders having a true subway with half-mile spacing there.

      25. It is far though

        Not as the crow flies. Here is the distance between the stations:

        Westlake to Capitol Hill — a little less than a mile
        Capitol Hill to UW: 2.25 miles

        If you didn’t know any better, you would figure a subway train would reach about 60 mph (or a mile a minute). So not counting the rest of it, that means:

        Westlake to Capitol Hill — less than a minute
        Capitol Hill to UW: 2 minutes, 15 seconds

        Then you have to add the acceleration, deceleration, the fact that the track has curves and that gets you to basically what it delivered. In other words if you looked at the map and estimated how long it would take you would be very close. It really shouldn’t have been a surprise to anyone who looked at a map with a scale on it.

        But we aren’t used to thinking in those terms. We tend to think in terms of time, not distance. In a city like Seattle, that is usually based on driving with walking a distance second. But driving gives you a warped sense of distance. You think of long-distance locations that are connected by the freeway as being relatively short. You think of places with lots of cross streets and traffic lights as being long. In the north end you tend to think of north-south as being shorter than it is and east-west as being longer. In the last twenty years or so, I’ve started taking what my friends and I jokingly call “Urban Hikes”. No hurry, just walking through the neighborhoods. The perspective is different. You feel like you can “cover a lot of ground” going east-west. It takes forever to go north-south. But that is just the perspective compared to what we are used to (driving, riding the bus and even biking). I’m walking the same speed either direction. But such a change in perspective is common.

        The subway line changed that perspective because it was underground, in a brand new tunnel. It didn’t run close to the freeway (at least not then) like the express buses. You can actually travel faster, at noon, than any other mode. This is very different than the “Supertrain” idea.

      26. “Seattle wanted those extra stations, but the suburbs didn’t.”

        I doubt even the Seattle city government wanted those stations, or did anything to try to get them.

        Maybe. There was certainly enough incompetence to go around. This goes back to the original issues. We should have used the Forward Thrust map as a guideline (https://www.theurbanist.org/wp-content/uploads/2018/05/17013207411_cce9745488_o.jpg). That doesn’t mean you follow that map entirely. Things have changed. But the idea should have been the same. Lots of stations in the urban core. A county-wide proposal with room for future expansion. Not light rail but heavy rail (or to be more specific, automated light metro — like Vancouver). Cooperate with Metro and throw in a lot of bus improvements as well. Remember, a majority of voters supported Forward Thrust (it just fell short of a supermajority). If the county only needed a majority it would likely have passed.

        There are political issues but don’t lose sight of the main goal: building a classic metro that integrates well with the buses (live Vancouver). This is very different than the main goal of Link (The spine). It means you don’t skip First Hill. Not without a plan for picking it up with a later line. It means you go down Rainier (not MLK) with lots of stops and if there is no stomach for cut-and-cover or elevated you avoid that for now. You can always come back later (unlike bus routes, mass transit is a “measure twice, cut once” proposition). Given the political winds at the time, starting with Northgate to Bellevue would have been quite reasonable. Spend a lot of money on buses (and bus infrastructure) for the South End to compensate. Of course you future-proof it with expansion plans beyond the county but you don’t promise Everett-Tacoma — that is just silly.

        At the same time, there is value in having a regional transit agency (or expanding what the state does). But they shouldn’t be the one building the subway. It should be King County. Sound Transit should run Sounder and regional buses. They should also act as facilitators between the agencies so that they can cooperate when their buses overlap (and they should overlap).

      27. “It is far though”

        “Not as the crow flies.”

        People can’t fly like crows.

        “We tend to think in terms of time, not distance.”

        Time is what makes the difference in how many activities you can fit into a day, and how much you’re forced into boring idleness you don’t want to be in.

      28. Thanks for the Forward Thrust 1985 diagram, Ross. It’s similar to the 1970 rail diagram here:

        https://53studio.com/products/seattle-rapid-transit-proposal-1970?srsltid=AfmBOoqK9vvw5HzUXJtmQLolP14s7bcyhSpz52ABwqQHMvmUqgax1w-K

        It’s all academic at this point as the current tunnel is in operation and there was not a provision to add an infill station in North Capitol Hill or Montlake. But even our forebearers 56 years ago were smart enough to recognize that there should have been at least two stations between UW and Downtown if not three. It’s only one because ST cancelled First Hill Station rather than move it to North Capitol Hill somehow, and that decision was driven by both constructibility and cost.

        And I would have preferred that the bored tunnel serve greater Capitol Hill with two or three stations especially with a bore further eastward. Alas, ideas remains armchair reveries at this point.

        I do think that there’s value to think how things may have been different if rail was planned and built by KCM rather than ST. KCM would have wanted crowded bus relief with more central stations, while ST seems obsessed with serving longer trips between cities.

        And a final aspect to think about is how it has affected the regional urban form. Had a more concentrated system be built, Seattle would be denser than it is while the suburban cities would be even more suburban than they are. By having rail transit run further out, the region can grow or sprawl across a wider area.

        ST built what they have and plan on building out even further. The burden now shifts to the land use strategies in all the cities that got rail stations. Will the outer stations ever be more than parking garages and apartments and suburban transit centers? Only time will tell.

        I think that outer stations should be work destinations or other types of destinations. These cities (Downtown Bellevue excepted) need to change their mindsets about what goes bear a Link station. Putting a garage and a handful of apartment buildings at every station for 10 miles is not just bland, it’s wasting the light rail investment.

        I look at what Starbucks announced last week and rue that they didn’t instead propose moving HQ functions to Lynnwood or Federal Way (or to Downtown Everett or Tacoma Dome). Maybe they will reconsider in the future. The median home value in Pierce County is comparable to the Nashville Metro area, and the median home value in Williamson County TN mimics the Eastside. Commutes will take longer there too. And the international transport logistics to Nashville is seemingly worse than Seattle. While transit use in an outer Puget Sound city will be lower than central Seattle, places like Nashville will still have much less transit use than an outer city in our region would.

        If the region’s cities want to help Link succeed, they should be actively getting corporate offices, medical centers and colleges to relocate to station areas at the ends of lines as well as bettering their connectivity to the rail stations.

      29. ““Prohibitively costly” compared to what? We have trains to Lynnwood — and are planning on trains to Everett — and yet we couldn’t afford a station at First Hill? Sorry, but that is absurd.”

        [ah]. Compared to not having U-Link is the short answer. This decision to drop FHS was made in the very early aughts when ST was delivering what it could of Sound Move using SM revenues. There was no ST2. There was no board direction to staff to plan ST2. There was only the Initial Segment and the revenue left over to figure out how to get the line north. And adding FHS would have rendered that project non-competitive for federal funding under the Bush Administration’s management of the New Starts program at the time. SO it was a case of build what we could afford, or build nothing at all.

        I suppose we could have waited for ST2 to come along. But then Northgate and all the other ST2 deliverables would have been that much later being realized. Hindsight is always 20/20, so let’s not forget the dynamic at the time. To get to UW, ST to stretch the scarce remaining Sound Move revenues as far as they legally could and make the project fit into the federal policy construct. Those are just facts. And for the effort, we got all the ST2 deliverables as soon as we did.

      30. [reply to ah]

        This decision to drop FHS was made in the very early aughts when ST was delivering what it could of Sound Move using SM revenues. There was no ST2. There was no board direction to staff to plan ST2. There was only the Initial Segment and the revenue left over to figure out how to get the line north. And adding FHS would have rendered that project non-competitive for federal funding under the Bush Administration’s management of the New Starts program at the time. SO it was a case of build what we could afford, or build nothing at all.

        Yes, obviously. Look, it isn’t that complicated. Start with UW to downtown. Build that section first. No tunnel to Beacon Hill, no big controversy over what to do in Rainier Valley, no miles of pillars to Tukwila. Just a line from Downtown to the U-District — the same line every transit engineer in the world would tell you to start with. The line that would get you the most riders per mile (and thus the best chance of federal funding). If you fall short and only get to the UW Station (for a while) it isn’t the end of the world. As it turns out, that is what happened anyway.

        But the focus was on the spine. So instead of even trying to get from the UW to Rainier Beach (which one of the board members recommended because it would provide the most ridership) they ran it from Tukwila to downtown. This was a lot less useful but it made it clear to suburbia: We are focused on you.

        I suppose we could have waited for ST2 to come along.

        That is basically what happened! Holy cow, you are trying to lecture me about history and you aren’t even aware that the train didn’t reach the U-District until they funded ST2!

        It really isn’t that complicated. The original line (to Tukwila) cost $2.2 billion (not counting debt service). U-Link cost $1.9 billion. That means we spent over $4 billion dollars before we finally got to the UW (but not the U-District). You think they couldn’t have added a station in First Hill for $2.2 billion? It is quite possible they could have added the First Hill Station and had money left over to extend to the U-District, building our core years before ST2.

      31. “We tend to think in terms of time, not distance.”

        Time is what makes the difference in how many activities you can fit into a day, and how much you’re forced into boring idleness you don’t want to be in.

        I think you are missing my point. If I ask “How far is it to your house?”, some people will respond “Not far at all, only about a half hour”. First, that is a distance (and thus they didn’t actually answer my question). Second, the assumption was driving. A lot of people really don’t know distances — they only know the time it takes to get somewhere by car. Given that, it is no wonder they would be surprised at how “fast” Link is.

        “Not as the crow flies.”

        People can’t fly like crows.

        No, but the train operates like it. That is my point. My point in that little story was that it should have been obvious how long the train ride would take just by looking at a map. But people think in terms of existing transportation options. In this city for a trip like that, it is mostly driving. But unlike a lot of other trips in this city, driving takes a while. The bus is worse and walking takes a really long time. Even biking — often the fastest mode in a city — is not that quick for that trip. That is what makes that particular section (and many others in a typical metro) so special. It is the fastest mode, at noon.

        In contrast, think of a trip from Lynnwood to Northgate. No one who takes that trip thinks “Wow, that is so fast” even though the train reaches the same speed. That’s because people are used to driving between those two locations (or even taking a bus). The point is, the train trip between there really doesn’t change the way people view transit. Sure, it is useful — it avoids all that traffic — but it doesn’t surprise anyone. Nor should it.

        Of course changing the perspective on transit is just a side benefit but it has political implications. Another statement I overheard about Link at Capitol Hill Station was that it “was just like the New York Subway”. This too, is absurd. Obviously it isn’t. But then again, there are clear similarities. It really is a subway. It really does operate through the core of the city — and save riders a huge amount of time — just like in New York. It is this aspect of Link that was bound to be popular and bound to change the perspective on the project. As a result, it would have been much easier to get other areas to see the inherit value — to want to be part of it. It would have been easier to cooperate with neighborhoods in Rainier Valley and Southcenter to better serve those areas. The initial plans were too abstract (and quickly got mired in major funding issues) to provide that. People were hesitant and afraid of damage more than they were excited to see the train.

      32. “I suppose we could have waited for ST2 to come along.”

        “That is basically what happened! … the train didn’t reach the U-District until they funded ST2!”

        U Link was funded by ST1 and would have opened in 2016 without ST2. The decision to restart U-Link was made around 2005. The ST2 vote was a few years later in 2008. It’s Northgate Link that ST2 funded, which included U-District station. And ST2 funded Lynnwood Link of course.

        Restarting U-Link was based on ST’s finances recovering from its 2000 meltdown and reorganization, and a new less-risky alternative for the Ship Canal crossing.

      33. “Another statement I overheard about Link at Capitol Hill Station was that it “was just like the New York Subway”. This too, is absurd. Obviously it isn’t. But then again, there are clear similarities. It really is a subway. It really does operate through the core of the city — and save riders a huge amount of time — just like in New York.”

        I felt like,”Wow, this is like New York!” last week when trains were running every 4 minutes in the PM peak, and at Capitol Hill there was a line to go up the escalator and some 50-100 people getting into and out of trains while I walked from the train to the escalator. It may be Seattle peak hours at a few stations vs New York midday at a lot of stations, but it’s an unprecedented milestone for Seattle. (!!!)

        And when the 2 Line was still suspended in Seattle last week, midday 1 Line trains got pretty full again like they had been before simulated service started. Not so full you couldn’t get in, but it was standing room only midday.

      34. It’s Northgate Link that ST2 funded, which included U-District station.

        Correct. I’m really saying a few things here.

        1) Any line from the UW to downtown should include First Hill and Capitol Hill as a minimum. You are *always* better off adding the important stations, rather than skipping them. It is relatively easy to extend a line. It is hard as heck to backfill. (By the way, that was the whole point of this thread.)

        2) The U-District is an excellent northern terminus. The UW Station is not. The UW Station works for transfers from 520 (and to an extent the hospital and campus) but otherwise it just isn’t that good. Even if you put it in the triangle — and they should have — it barely touches the area. Riders who were used to their express bus to downtown were forced to slog their way to the other end of campus — an area with very little. In contrast the U-District is a solid terminus. You connect to the neighborhood, the buses, everything. But it really is the combination of stops there. You really only need one more (midway between the two) either in the campus itself or at Campus Parkway.

        3) With no additional funding, we could have easily built a line from the UW to downtown *with a First Hill Station*. It is likely the train could have gone farther, to the U-District. But even if it just ended at the UW it would have been a much better value.

        ST has made numerous mistakes and they really follow two themes. One is not accurately estimating the cost of work. The other is focusing way too much on distance and not station placement.

      35. Ah, I see what you did there.

        Thanks @Mike Orr for for correcting the ST phase that funded U-Link. This is why context matters. And why long time users of this space bear some responsibility for helping newer readers understand how we got here.

        Much of this thread is criticizing ST’s past decisions that resulted in FH being left out, without really analyzing why, nor weighing how the agency redeemed that opportunity cost.

        Ross says they could have built the north line first. They fumbled that opportunity when the first design-build bids came in on MOS-1. As the result of that mistake, transit opponents responded essentially by trying to put ST out of business, locally, in Oly and in DC, which would have repeated the whole Atlanta/Marta experience all over again.

        There was no chance of building the north line first at that point because they couldn’t afford it. And the federal money was yanked by Dubya’s FTA. Instead of letting it be granted to another city, Patty Murray and Norm Dicks forced DOT to hold on to it, and bought time for ST to pivot. That’s what happened. They chose to build the project first that had the lowest construction risk – the initial segment – to establish their bona fides with FTA and re-secure that 500M. They took the time while that was being delivered to re-design U-Link to make lemonade out of lemons.

        Ross correctly observes the agency spent $4b on Link under Sound Move. Except that $1.3 Billion of that was federal money, so really the region spent $2.7B. The point is, the never would have gotten that first 500M if they hadn’t built south first, which means they wouldn’t have had the time to re-think the north line. And they would not have gotten the $831 million from FTA for U-Link – my initial point above – if they’d included FHS.

        As it was, they got both grants, and they held the 2016 timeline for U-Link, which enabled Northgate and the major ST2 segments to be planned and designed to allow layered, sequential delivery. The real result of the decision to forego FHS was the ability to deliver eight segments to revenue service in 10 years from 2016-2016 (U-Link, Angle Lake, Northgate, Lynnwood, East Link starter line, Redmond extension, Lynnwood, and Federal Way). With a ninth coming this month. Not a bad outcome overall.

        So no, circumstances were such that building north first was financially and politically prohibitive, and the pivot the south saved the agency and the system.

        We can argue all day about whether it’s good or bad that FH isn’t on the system. I think it’s a bummer it got removed. But ST had no choice based on the fact pattern of the time. ST2 came along and backfilled the FH streetcar for people to access the hospitals from the Link system. Not ideal, but at least the connection exists.

        And adding a FH station now is just cost prohibitive and operationally infeasible. The ground under FH is still saturated glacial till that would liquify during attempted excavation. So you’re still talking about hundreds of millions or more than a billion for a single station.

      36. “The U-District is an excellent northern terminus. The UW Station is not.”

        OK, the ST1 ballot measure went from U-District to SeaTac. North of Westlake was deferred in the 2000 financial meltdown and the decision to start with the south segment. Around five years later as ST’s finances stabilized and a less-risky Ship Canal alignment was identified, the Westlake-UW segment was revived, but not UW-UDistrict. I always assumed that was for budget reasons: the budget couldn’t stretch to U-District without spending more than ST considered seemly, so that part remained deferred to ST2.

    3. I think the less costly and less disruptive way to connect First Hill is with Link is to look at an added cable-pulled connection. Among the streets, Jefferson Street is the easiest as the adjacent properties all appear to be owned by local government.

      I’ve suggested a Jefferson St funicular between Harborview and Pioneer Square station . Others have suggested gondolas. Even some system of escalators could work.

      The objectives need to include automation, high frequency (short waits) and safe/secure environment.

      The steepness of First Hill is the biggest deterrent. If the area was flat, it would be a mere short walk from Link. Link trains can’t climb a steep grade like that. Cable technologies easily can.

      For a Link train to serve First Hill, the station would wildly deep or there would need to be a portal (or portals) mid-hill where track would need to transition to aerial segments. That’s much more ambitious than a mere short infill tunnel.

      1. “The steepness of First Hill is the biggest deterrent. If the area was flat, it would be a mere short walk from Link. Link trains can’t climb a steep grade like that. Cable technologies easily can.”

        I’m guessing this is the reason why a tunnel was never built under Madison, idk if it was ever considered though instead of BRT.

      2. Madison Street high-capacity transit was in ST’s long-range plan until 2014. At the time the board was deciding whether it was still necessary or whether Rapid ride G would fully address the need. In the end it decided a Madison subway wasn’t needed.

      3. Mike, for Madison you got two components:
        – The first component is the urban one, it’s close to Capitol Hill, First Hill, and Downtown Seattle. Of course a tunnel route would make sense but it’s the next part that I will explain that scrambles it up.
        – The second one is east of the urban one, more of a “suburban” feel, closer to the water, more nature, a richer feel… It’s kind of weird to put HCT in the east sector of Madison, so no wonder the G doesn’t go up to Madison Park even though it was because of local opposition.

        So Madison is basically your breakfast at IHOP (speaking of which there is an IHOP on that street) but with a side of extremely scrambled. Does that make sense or not?

      4. The Madison HCT corridor was from roughly 3rd to Broadway. I don’t remember the exact termini, so it may have extended west to the ferry terminal and east to 12th or 15th or 23rd, but not all the way to Madison Valley or Madison Park. My impression was it would be an underground subway, although ST never studied it far enough to have specific concepts or explain how such a short subway would be feasible and where its maintenance base would be.

        A subway would of course have fewer stations than RapidRide G or its ancestor 12, so it might have required a shadow bus route. ST never got far enough to consider those issues.

      5. Somehow cars are able to drive up First Hill. A Ballard-Westlake-First Hill-Judkins Park line should be elevated, not tunneled, and if the grades are too steep for rail, make it a rubber tired metro.

      6. … or whether the Madison segment could be attached to another line. There was no other line at the time; e.g., nothing from Ballard or Aurora or elsewhere that could have turned on Madison.

      7. “Somehow cars are able to drive up First Hill.”

        Cars are not light rail. Modern trams supposedly can’t climb as steel hills as early 20th century streetcars could, not to mention old cable cars. I don’t know why. The steepness would also affect an elevated alignment. But trolleybuses can climb steep hills like cable cars can, as the 12 proved, so you could have a trolleybus solution with transit lanes. The G was going to be trolleybuses, but ST couldn’t find an American supplier for trolleybuses with doors on both sides.

      8. A subway line for Madison has a lot of issues. One is expense. Another is distance. As you mentioned, density goes go way down as you get past MLK (although it goes up a little as you get to Madison Park). This means that the vast majority of trips are short. A subway line would be very deep. The combination of short trips and deep stations is not a good one. You might save some time with the faster train but you lose it with the time spent going up and down to the station. Then there are the stations themselves. RapidRide G has urban stop spacing (like the downtown tunnel). So now you are building a line that is relatively short and has over a dozen stations (and that assumes it ends at MLK). That is a lot of money and many riders would be better off with the bus. You can save money by having fewer stations but then a lot more riders are better off with the bus. The only riders that would be clearly better off with the train would be those from farther away and there just aren’t that many riders there. Maybe it would work if it was automated and integrated really well with the main line but that would be really expensive as well (even if it had fewer stations). Even though we planned on building it (as part of the original bus tunnel) there is no station at Madison. So that means the train would have to dogleg and go under the Symphony Station (at University) and somehow connect to it really well (with a small set of escalators). This can be done, but it would be really expensive and likely shut down the main line for a while. Buses would also benefit (riders from Montlake would take the 48 and then transfer) but again, the benefit would not be huge compared to the RapidRide G. I’m not saying it can’t be done but it would be really expensive and once you start cutting corners (which this agency has been prone to do) you end up with something that isn’t that good and definitely not worth it.

        In contrast, consider the extension of the Ballard line that was mentioned elsewhere (https://i0.wp.com/seattletransitblog.com/wp-content/uploads/2024/01/First-Hill-line.png). You have plenty of good one-seat trips that aren’t short (e. g. Uptown to First Hill). This makes up for the deep stations. The connection at Westlake may not be ideal but the route complements the surface transit instead of trying to replace it. If I’m trying to get to Madison and Broadway from the UW I’m just going to take the streetcar or 60. But if I’m going to Terry and Spring I’m taking the train, even though the transfer might be time consuming. Yesler Terrace might be faster with surface transit but Jackson wouldn’t. Going the other way it becomes faster to transfer. Bellevue to First Hill means a transfer at Judkins Park. Even if the transfer is really awkward (underground to above ground) the alternative (a bus to First Hill) is bound to be slower. This is especially true if you came from the south end. It also adds more for other buses. The “South Lake Union” station will be designed to connect to the Aurora buses. But if riders are heading downtown, it isn’t worth the transfer (might as well stay on the bus). Even if they are headed to a Link destination (e. g. Beacon Hill) it won’t save that much time versus staying on the bus and transferring later. In contrast, if they are headed to First Hill then by transferring at South Lake Union they save a lot of time, even with the deep bore stations. The same is true for people taking a “Madison subway” from Montlake, it is just that there are a lot more people coming from from Aurora.

      9. “A Ballard-Westlake-First Hill-Judkins Park line should be elevated, not tunneled, and if the grades are too steep for rail, make it a rubber tired metro.”

        The original “sin” is that the DSTT2 segment and the final Ballard Link alternative segment never got thorough study before ST3 adoption. It led to the ID uproar. It led to the very low cost estimates that are 200 percent too low. It led to the awful 3D maze plans for high-volume transferring between lines Downtown.

        ST had a chance to revisit that “sin” in 2017-2019 but refused. They doubled down on the ST3 ballot alignment and still show no willingness to revisit it to this day. The recent piece about saying that abandoning DSTT2 may save no money or it may save over $4B (a range bigger than the original range for all of WSBLE in 2016) shows how dogmatic ST is about keeping the alignment. The Board even did not get an estimate of how shorter, more frequent automatic trains could further reduce the costs — and the Board did not push staff to go back and look at an automated train alternative.

        And at the last Board meeting, the Board even voted to allow property acquisition through condemnation to begin on the corridor even with the shortfall, the lack of a published revised DEIS for Ballard or a funding plan for West Seattle. So outside of a giant scandal ST isn’t budging.

        *****

        In an alternative universe, I would have suggested that Capitol Hill be the transfer point instead of Westlake if First Hill was back on the table. The track grades would be much gentler and a portal near SLU would enable building an aerial segment in the Mercer Street corridor though SLU (closer to the sidewalk as the 99 tunnel is forcing Link stations even deeper in SLU). I note that the retail focus of Westlake has greatly dimmed since the 2016 ST3 vote. That alignment would result in just 2 underground stations at Capitol Hill and First Hill rather than the 7 currently planned if the ID station had a portal at 4th and Washington and the ID station was aerial above the BNSF tracks. .

        Another way: An automated Ballard Stub would not have to go underneath Link downtown to continue to First Hill, as automated trains can change direction pretty quickly like DLR in London does. A train could continue to First Hill by reversing direction, run through a new tunnel that makes a U-turn and crosses Link east of I-5 and climbs to First Hill.

        *****

        These are all mere sketch ideas. ST has no interest for any of that — unless forced by a Board member who has support from other Board members. There is not even an automation study yet, yet the majority of new transit lines opening around the world are now automated. Getting ST to change course seems as far fetched as Washington State becoming a Canadian province. ST is still stuck in the past when it comes to rail technology.

      10. Mike that’s my point. If the “Link” line used a different technology (such as rubber tire trains like in SeaTac or in Montreal), then the train can handle the same grades as a trolleybus.

      11. “no wonder the G doesn’t go up to Madison Park even though it was because of local opposition.”

        The reason the G doesn’t go to Madison Park is the original project was scaled to 23rd. The public pushed to extend it to MLK to serve Madison Valley. Some people including me argued to extend it to Madison Park, but an SDOT rep told me in an open house that there wasn’t enough money in the budget for that.

        Neigborhood opposition to the G in Madison Park is just theoretical because they were never asked: SDOT didn’t even offer it as a possibility because it couldn’t afford it. In the 1960s the neighborhood pushed to dieselize the 11’s ancestor to get rid of unsightly trolley wire, at a time when Seattle Transit was contracting the overall trolleybus network. 2015 or 2026 is very different from the 1960s: different people live in Madison Park, and the overall public mood is more positive toward transit, climate sustainability, and density. The current Madison Park residents are doubtless more skeptical of those things than the average Seattlite, but they may be less strongly opposed than they were in the 1960s. Again, they were never asked, or given an official project alternative to comment on, so we don’t know. We shouldn’t overestimate how negative they might be now if we don’t know for sure.

        What Madison Park, Magnolia, etc, have been told is that since they don’t want to upzone to urban villages, they won’t get any transit upgrades either. That doesn’t mean SDOT/Metro would never extend RapidRide to them anyway; it just means it would only happen if it’s for overall network efficiency or cost-saving, not as an amenity to them if they demand it. If they want to demand a transit upgrade, they have to densify.

        Some people like me think the G should have gone to Madison Park for network efficiency and transit best practices, to have a straight grid route serving all of Madison Street. The alternative is what we have now and have always had: one route for the western half of Madison, and another route for the eastern half. Previously it was the 12 and 11; currently it’s the G and 11.

        A Madison Street subway would serve only the western third or half of Madison Street, so an 11-like route would still be needed for the eastern half. (Metro Connects and Ross prefer an 8-Madison route; i.e., Uptown to Madison Park or Smith Cove to Madison Park. But that’s separate from the issue of whether Madison Street should have one route or two.)

        We don’t need to go down the rabbit hole of elaborating specs for a Madison Street subway, because ST has long abandoned it and nobody else is suggesting it. ST’s assumptions for a Madison Street subway were Link technology of course. Other technologies might be better adapted for the steep hills, but that would require convincing ST of it, and that’s moot since the entire concept of a Madison Street rail line has been abandoned.

      12. Al, you can’t run aerial across Mercer esst of SR99. Maybe Republican would work by single-laning the street and one-waying it, but there’s no room for the supports on Mercer. An alignment on Republican would also serve more of SLU. Mercer is only one fairly short block from Lake Union. That’s a lot of walkshed to waste.

        The idea of moving the transfer point to Capitol Hill isn’t terrible, especially for Westside to UW trips, but it would be an enormous political lift. It would seriously hurt ridership at Uptown. Folks would just take the trollies in order to miss the transfer at Cap Hill.

        Shallow New Westlake, shallow Midtown at Sixth, deepish First Hill at Madison and Boren or Terry and shallow Yesler / Harborview is elegant and has three new stations with knockout level walksheds.

    4. Absolutely and postively not, at least, not for less than a couple of billion dollars and three months (and probably much longer) of complete closure of the system.

      1. True that, Tom. Let’s not forget that 3rd Ave and the transit tunnel will shut down for years if interlining is chosen as the fix for Ballard Link.

      2. That closure is going to happen anyway, if the planned DSTT2 gets built. They have to remove Line 1 track and create a connection to put trains from the south into DSTT2.

        That’s not to say a different DSTT2 plan couldn’t be produced that would be lass disruptive, but the current plan is going to be quite painful on existing service.

      3. Glenn, I don’t think that the re-configuration south of Stadium as planned by ST is that big a deal. Basically they would build the WSLE trackway on the busway to the reconfiguration point, drill DSTT2 to Massachussetts and dig the portal ramps to just east of the existing Spine tracks.

        Then they’d shutdown for a three to five day period to cut the main, pull up the existing tracks for a couple of hundred yards, drop in track panels with the proper curves already constructed, and bolt it all together. Railroads do junction re-configurations regularly. Not frequently if they can help it to be sure,but it’s a known skill. I’m sure you know of such projects.

        NS did a huge one in Atlanta about eighteen months ago, in 36 hours. Of course, it did not involve overhead.

        And yes, the overhead might actually take longer than the track work, but maybe they could have “signal-bridge” like supports across all four tracks in place for the overhead through the transition zone before cut-over.

        I would suspect they’ll keep at least a trailing point connection between SB Line 1 and NB Line 3 with cross-overs just away from the connection, for MF moves if nothing else.

        And Scooby, I’m a person who has been screaming “No!” to the idea of interlining north of Symphony for years, precisely because of the catastrophic level of disruption it would cause. The idea had a flurry of popularity here five years ago, but enough screaming convinced folks that it would mean rebuilding the entire two blocks worth of trackage between Symphony and the Third and Pine curve. That is ST’s conclusion also.

        So don’t go sneering at me about that topic.

      4. Addendum and correction:

        IF ST has tested the tunnel north of the portal it could take as little as three to five days. If they have to test it after the tunnel is connected service would be interrupted for much longer.

      5. We don’t know how much DSTT2 construction will impact DSTT1. It only needs transfer interfaces at Westlake and Pioneer Square. But given that the existing infill projects have had ten times more closures than we expected, we have to assume that DSTT2 will be the same.

      6. Tom:
        Tokyo did an extremely complex reconstruction in a single overnight shutdown with no delays to regular service. Among other things, it involved lowering the station platforms several feet as part of the line was converted from surface passenger service to serve underground metro trains instead. It was featured here on a Sunday movie some years ago:
        https://m.youtube.com/watch?v=_BYW4YYqG5A

        Just because something is possible, however, doesn’t mean SoundTransit will choose to do that which is possible.

        The shutdowns required to tie in Line 2 to Line 1 at CID seem to be the minimum that should be expected, if they choose the current DSTT2 plan.

      7. Mike, we weren’t talking about the interfaces around Westlake. Yes, that might close portions of the existing Mezzanine intermittently over a very long period while portals to the new station box and access tunnels are demised.

        What we were talking about is the re-configuration of the planned-to-be-four tracks south of Stadium. The portals of DSTT2 are planned to be just north of South Massachussetts Street with the Line 1 tracks will be curved east into the portals. At the same time, the newly constructed Line 3 tracks on the busway will be given an “S” bend to connect to the formerly Line 1 tracks just south of Stadium.

      8. Ross, probably so, depending what exact configuration they choose. Certainly the pedestrian paths to the Link platforms are going to be impacted intermittently, since the new, farther south Line 1 platforms will be somewhere the paths are now. It’s probably possible for the east-side path to the northbound platform to be moved east into the parking lot, but the west-side path is squeezed between the busway and the southbound track. The busway is going to be used for the Line 3 tracks.

        Ideally, since there is to be an overhead station structure to enable enclosed interline transfers, the side platforms will be replaced with center platforms for both lines. That would reduce the distance that northbound Line 1 to southbound Line 3 transfers have to walk by two tracks’ width. The other direction — northbound Line 3 to southbound Line 1 — could and should be accommodated by a third platform between the two Lines which is used only for transfers.

        That would make West Seattle – Airport trips the fastest possible other than a configuration using track-sharing to the north with a single center platform.

        As long time readers know, I see no real reason not to share the existing tracks for hosting Line 3. There will never be trains scheduled more frequently than every six minutes in each direction from Line 1 and every ten minutes from Line 3. Grant, trains keeping proper headways would arrive from both lines simultaneously twice per hour. [The headways would be 6-4-2-6-2-4-6-0-6-4-2-6-2-4-6-0 Bolded times are Line 3 arrivals.)

        However, Line 1 timekeeping is pretty abysmal by the time the a train leaves Mt. Baker, so the conflicts on the “hour” and “half-hour” would typically put the Line 1 train a minute or two behind the “conflicting” Line 3.

        This can even work with DSTT2, assuming some track re-configuration at the pocket track south of Stadium. As it is now, it is not long enough to surface a train from DSTT2, but if it were extended most of the way to Holgate the southbound track from DSTT2 could rise up between the north and southbound “Spine” tracks. This would require taking the northbound shoulder of the busway from Massachussetts to Holgate or both shoulders with a center breakdown lane. Since buses rarely break down on the busway, this seems a reasonable “risk”.

        How it would work is that the southbound track from DSTT1 would be moved into the space of the northbound busway shoulder and the southbound track from DSTT2 would rise up between that southbound DSTT1 track and the northbound “both tunnels” track. The northbound turnout to DSTT2 would be placed a bit north of Massachussetts where it is currently planned to curve.

      9. @ Tom:

        I think that West Seattle Link construction will end up requiring some 1 Line closures. I can’t see how ST would not build some sort of crossover tracks in SODO as part of the project at the very least. There’s also the matter of building a huge glass and steel and concrete box around and above the existing tracks too and then they intend to move the platforms northward in the current plan. Finally, there is the construction of the Lander overpass that will disrupt the 1 Line.

        And some of us like you and me hope that ST revisits the track configurations and SODO platforms.

        We are waiting to see the Ballard Link EIS that keeps bringing delayed for details.

      10. Al, yes, the overpass will have some impacts, but I expect that they can build it without extended closures of Link. Yeah, for sure when they place the support beams they don’t want trains running underneath…..

        But that should be doable over several nights. Ditto the station box; again, when they do the floor, no trains. But while they build the interior, and even the walls of the upper level, trains should be able to run. They might need a temporary “roof” sticking out to the north (and apparently the south) to keep small stuff from falling on the tracks.

        I didn’t know that they were going to move the platforms NORTH!?!?! Won’t that make bus transfers to and from the 50 at a minimum less easy? They can’t have the platforms directly under Lander, because the grade up to the Forest Street curve starts immediately south of Lander. But, wow, it should be close to the overpass. Otherwise they’re going to force buses to loop through the station, making the West Seattle-eastside rides even longer. Ugh!

      11. “Won’t that make bus transfers to and from the 50 at a minimum less easy? “

        ST is planning to close the busway completely. Route 50 buses will have to stop on Landet.

        ST also must build escalators, elevators and stairs. That means that the station itself must close for an extended period of time.

        Note too that no down escalators are planned.

        ST isn’t ready to tell Route 101 and 150 riders that they’re losing the busway, by the way. When they find out, there won’t be any opportunity to do anything.

        I don’t know why ST won’t rethink the station. Phasing would be easier if they first built a new 1 Line southbound platform as the westmost track along (with the vertical stuff up to the new overpass). Then ST could then add the crossover tracks. After that ST could single track the 1 Line through SODO station for that very short distance at the new platform until all the other tracks and platforms are built. They’d just need a short closure period to connect the initial switches for southbound trains so that they could use the new platform before tying back into the current track.

        The preferred alternative for SOADAO is going to be more disruptive to build, more costly with three sets of vertical devices and more effort to transfer with two level changes. Note that this station will have a huge number of transfers too — more than most total activity at other ST3 stations. And maybe 50-100 transferring riders will surge off one train, jam up the escalators and stairs up and then jam the stairs back down (no down escalators).

        I don’t know if the designers are sadistic, out to pad their design fees or just stupid. But the station layout is truly indulgent, expensive, problematic to build with service disruptions and a future hassle for riders for 100 years with two level changes upon opening.

    5. Yeah, what Mike wrote. You can, it would just be really expensive. You essentially have to built a brand new, expensive subway line. Then you have to connect it to the existing line. This is very expensive. London does that sort of thing but they are London.

      1. Oh, and you would be much better off making it an extension of Ballard Link. This would probably be cheaper.

      2. So Ross, are you saying that you prefer having a First Hill line than a second transit tunnel? First Hill is parallel to Downtown Seattle, so I get what you’re saying. I’ve seen the proposals for a First Hill line, and I got to be honest… I’m not a big fan of them, but First Hill should be a “first” priority over transit tunnel crowding.

      3. We’ve had several articles advocating for Ballard Link to turn southeast to First Hill rather than a tunnel on 5th. We also pushed for ST’s Midtown station to be at 8th & Madison rather than 5th, so that the line would bulge out from Westlake to 8th and back to CID as an alternative. Moving midtown could be in ST3’s scope; there’s debate about that. And ST did move Midtown station another direction, south rather than east.

      4. So Ross, are you saying that you prefer having a First Hill line than a second transit tunnel?

        I’m saying it should serve First Hill either way. I’m not a fan of West Seattle Link or the second tunnel. But if you are going to have a second tunnel it should sure as hell serve First Hill. It is ridiculous that they never seriously considered it.

        But if you are talking about what ST should do (given the cost constraints and goals of ST3) then it is basically this. Start with Ballard Link to Westlake. Design it so that it can easily be extended. If and when we get more money, add more stations in First Hill and then go to Mount Baker. For West Seattle they should do this. Connect the Alaskan Way Viaduct with the SoDo Busway. Then run a bunch of buses from West Seattle to downtown via the SoDo Busway. This would be much better for riders in West Seattle (and much cheaper).

        Now if you are asking me what should be the first major Link package (regardless of what the voters approved) I would say UW to Ballard. The stops aren’t as urban but the impact to the network would be huge. Eventually we could build the rest of it (Ballard to Mount Baker via First Hill). Hard to say in what order though. Depends on costs and logistics. But it isn’t hard to think of some really good independent sections that are much better than what we have planned (e. g. Uptown to Judkins Park).

      5. Serving both (a transfer node around Union Station and a station most of the way to the top of First Hill) would be extremely difficult to accomplish. I think Martin was way too optimistic about the ability to make that First Hill Station given that you’d have to go up some to make it a reasonable depth for a high-volume station and then waaaaaayyyyy down to get down to the flats by Union Station.

        If it were elevated through there it would probably work from a gradient perspective, but where are you going to run an east-west elevated structure across the Avenues somewhere between Dearborn and Main? The International District has already shown its muscle on tunnels. How much more loudly would they howl at an elevated?

        No, you have to decide between The Chairman’s and Da Mayah’s bastardized “Midtown” in Pioneer Square or a First Hill stub that stays up in the hill and heads down a massively upzoned North Rainier Valley to Judkins Park and Mt. Baker.

        I find it telling that nobody has said “Yeah!” or “That’s crazy!” about the rather specific solution that I outlined above. It’s all just generic arguments about how hard “First Hill” is to serve (it is) rather than the specific alignment on Sixth which capitalizes on the topography of Downtown Seattle and it’s relatively modest grades up into First Hill.

        Doesn’t anybody else remember that the 2, 3, 4 and 12 used to go up Sixth to Seneca and turn? The 3 and 4 then turned south on Ninth — that’s the reason for that orphaned wire. That route almost never was snow-closed; it was the main access to the extreme east when the flakes fell.

        That was before the new slack overhead was hung in the current configuration.

    6. The G Line exists but people still have to complain that Link doesn’t go everywhere. Might as well turn the 1 Line into a complicated zig zag line that goes to every corner of Seattle that takes 30 minutes to get through.

      1. Might as well turn the 1 Line into a complicated zig zag line that goes to every corner of Seattle that takes 30 minutes to get through.

        No one is suggesting that. But serving more of downtown (like First Hill) is just common sense. It is why you build a subway. There is only one station between Westlake and the UW. That is ridiculous. It should have been designed — and built — more like a normal metro, with lots of stations in urban areas. It is worth pointing out that at least they planned for a station at First Hill but then when times got tough they focused more on getting to places like North Shoreline and Mountlake Terrace rather than another downtown station.

        The G Line exists but people still have to complain that Link doesn’t go everywhere.

        People in Everett and Tacoma complain that Link doesn’t go there. That is much sillier.

      2. That’s what street cars are for. Subways should have at least 1/2 mile spacing between each stop. Many people are taking it to get through/out of the city, not just within the city. Sometimes I actually prefer taking the bus because it goes closer to where I actually need to go. I don’t use Link to get to a specific location because it’s impossible for Link to get to every place people need to be. I’d actually hope that Link is faster to get to key locations like Chinatown, Pioneer Square, Westlake, Capitol Hill, U District etc. so I can switch to the bus sooner.

        More streetcars that aren’t as useless as the SLU one would be nice as well. I think all of you are trying to bring the purpose of a street car to Link. Link calls itself light rail but honestly I think it’s established itself as a metro, and should be treated as that. It shouldn’t have more stops than it already does.

  2. Overnight transit service (and better evening frequencies) has a Vision Zero benefit. Drunk and distracted driving are the bigger problems — much more than remaining bad street geometry is. The proportion of major accidents and deaths that happen after dark when compared to the amount of traffic is much higher. Unfortunately, it’s not a cheap thing to offer.

    And things like using more reflective paint on the pavement and adding better pedestrian level lighting would seem to help make nighttime travel safer for everyone too. The switch of old street lights into extra bright LED lighting creates blind spots in a field of vision at night.

    In contrast, what I read here appears to merely keep doing what has already been in the works.

    1. ” it’s not a cheap thing to offer.”

      It’s not expensive either. The cost is similar to a daytime route plus shift differential. We don’t limit daytime ST Express routes to one per subarea because more would cost too much. There’s a half dozen routes to every subarea, some running every 15 minutes. The overnight routes will be the only one to each subarea, so it has a greater benefit to the entire subarea than each daytime bus run does.

      It’s just an issue of agency and their cities’ priorities, distributing the total service hours available, and how much they push for more resources to have comprehensive transit service.

    2. I wonder how many people drink and drive because the late-night bus network isn’t that good. I know there is a strong correspondence when it comes to overall transit and safety (better transit saves lives) but I don’t know about drunk driving and the late-night network. Folks in New York routinely just take cabs at night as the trains run less frequently (and they do a lot of maintenance). I’m not saying that a good nighttime network isn’t laudable but the fact that so few people end up using it (no matter what we build) suggests it isn’t likely to have a huge impact on drunk driving (unfortunately).

      [Edit: Corrected a sentence both here and the quote by Mike]

      1. There’s two time periods to consider.

        Late night is one. Evening service is another.

        EVENINGS

        Thankfully Link frequency is high. It’s 10 minutes on each line until 10 pm and 12 minutes to midnight! It’s definitely awesome for evening travel.

        In contrast, many KCM routes even within Seattle go to 30 minutes or less frequency by 7 pm. It’s ironic as KCM is probably carrying a lower share of work trips than Link does.

        Should SDOT pitch in and fund more evening service? To me, if SDOT’s meters are expiring at 10 pm those additional hours of revenue should be helping to cover the extra cost of more frequent evening buses to 10 pm too. Extending meters to 10 pm but not funding extended frequent service to 10 pm is philosophically wrong.

        LATE NIGHT

        ST is finally owning up to initiating service overnight. While the actual execution is still unclear, it’s clear that they’re willing to take the topic up. At least KCM has something. The question for Wilson is whether SDOT resources should help make it more frequent too.

      2. “Folks in New York routinely just take cabs at night as the trains run less frequently”

        Night frequency is 20 minutes. That’s still fairly frequent.

      3. Sure, 20 minutes is pretty frequent. Especially when the train isn’t shut down. But throw in a transfer and a long trip and a cab become appealing.

      4. Some people in New York City take cabs at night, not everybody. Some people in NYC also take cabs in the daytime, but we don’t talk about that the same way. We don’t imply the subway can just be shut down and everybody can take cabs instead.

        I don’t know NYC’s current fares, but here Link and buses are a $3 flat rate, while a taxi is $3 per mile. That’s a major reason I don’t take taxis, because it’s not a good use of my resources. Some people take taxis anyway, but that’s their problem. The rest of us shouldn’t be forced to.

      5. There’s also less street congestion at night, which makes the cab much more compelling than daytime. Thanks to Robert Moses, it’s shockingly easy to drive in & out of Manhattan in the dead of night.

      6. I’ve noticed an interesting split between New Yorkers and suburbanites (Jersey City, Bronxville), with New Yorkers never driving, and suburbanites driving into Manhattan evenings and weekends but not weekday daytime.

  3. 2 Line is running in Seattle again. At Westlake saw a southbound train and boarded a northbound one. The northbound display is now saying “1” for both 1 & 2 Line trains. I had to walk over after the space behind the last car because I misjudged where the closest doors would be. I don’t feel bad that a big deal though, unlike others.

    1. “The northbound display is now saying “1” for both 1 & 2 Line trains.”

      Maybe it’s to prevent confusion? I mean 2 Line trains can become 1 Line trains once they reach ID/Chinatown, but that would kind of be weird.

      1. I could see a short-term reasoning behind changing the signs to read 1 Line as to avoid confusion. However the diagrams already say that a rider can get to Lynnwood on either 1 Line or 2 Line so it seems unnecessary. I actually think it’s more confusing to show 2 Line on a diagram but never show it on the sign than to have both lines going to Lynnwood numbered as 1 Line. Plus, the earlier that riders are made aware of a branched line operation, the less likely that they will end up on the wrong train someday.

      2. It seems to be a technical issue with the displays. Earlier they did say “2” with a blue circle, and southbound is still doing that. For awhile the northbound display said “2”, then switched to “1” after a minute or two, then switched to “2” again after another minute, then to “1” again. Currently they’re staying on “1”. So something needs to be configured in the programming apparently. I don’t mind if trains switch from 2 to 1 at CID; it doesn’t matter either way, except to the extent that people want to know which trains will be 2-car.

  4. Does anyone know why Pierce Transit operates ST Route 560? The route is entirely in King County. Was it designed as an extension of ST 574 (with transfer at Sea-Tac)?

    1. Because Pierce Transit is substantially cheaper than KCM. Even with the additional deadhead, it saves ST significantly operating cost to use PT vs KCM.

      Also, PT has historically had plenty of access bus base capacity while KCM was tight on base capacity pre-COVID. But haven’t worked on the team that managed this directly, I can confirm it is a straight cost decision. ST would use KCM for zero ST Express service if possible. KCM has the most expensive drivers AND has the most expensive overhead. KCM is the primary funding mechanism for the County Council overhead costs. Yes, Link pays for a significant share of the county council’s staff salaries, which is why KC will fight tooth and nail to ensure that Link operations remains a division within KCM, even if Link grows into something larger than the rest of KCM.

      1. ST really needs to just create a division for rail operators and maintenance themselves. It’s a big enough agency at this point that it should handle its own ops and training and maintenance. It would be way cheaper to do that than to have this weird, unaccountable arrangement that is going on right now, in my opinion.

      2. “It’s a big enough agency at this point that it should handle its own ops and training and maintenance.”

        I strongly agree.

        I even attribute the abnormally high number and duration of disruptions partly to the current organizational arrangement.

        The other related problem with the current arrangement is that ST is not hiring professional executives to manage and maintain the operation either. There is thus no real check and little consequence for careless or delayed maintenance or extended disruptions.

        A normal operation would have seasoned managers up the chain of command that get operations and focus on minimizing disruptions — and other staff who are more directly accountable to that operation’s mission.

      3. That makes sense. I’ve always figured there were some rules about KCM operating routes in King County, PT operating routes in Pierce Count, and CT operating routes in Snohomish County. If PT is willing and has the capacity to operate it, that works for ST.

      4. AJ, CT used to run the 540 which ran between Kirkland and U District… Entirely within King County! That was until PT took over the 540, ’til this very day the 540 remains the only ST route that has been operated by all 3 agencies…

        I’m also wondering why can’t the 510, 512, 513, and 532 be operated by Everett Transit, and the remaining CT-operated buses (the 515 and 535) could be operated by King County Metro. I would love to hear a King County Metro voice say “Lynnwood City Center Station”.

    1. SDOT was ordered to produce a plan by the end of April. Presumably the plan will decide which blocks ought to get red paint, and whether SDOT can paint the lanes themselves or if they need to contract it out.

    2. Why waste money painting Denny with bus lanes when bus service is planned to be abolished on it anyway? The city seems more into adding bus service Harrison, Republican, and Mercer streets, though Wilson might scrap that.

      1. Are you serious? There was a whole campaign about it last summer. It was literally the only definitive plank of the Mayor’s platform.

        Look up Fix the L8.

      2. I know about Fix the L8, there was a race…

        How to fix the L8:
        2010: Metro removes stops along Denny (doesn’t work)
        2016: Metro splits the L8 in half (doesn’t work)
        2026: Wilson proposes bus lanes on Denny (I’m uncertain on the effect)

        Anyways, the fate of the L8 rests in our hands. I could just suggest removing bus service along Denny between 3rd and Olive but I doubt the public will be friendly with that. My point is that Denny is just congested (likely because of Seattle Center) and needs reworking… But is it wide enough for new bus lanes? Nah, they’ll just paint an existing lane red… How will congestion get with the removal of some lanes? Will this increase ridership on the L8 or will it make it even more late than it already is? Think about it.

      3. Actually, by increasing ridership I meant increasing reliability.

      4. “My point is that Denny is just congested (likely because of Seattle Center) ”

        It’s because of the I-5 entrances. Cars line up for blocks at freeway entrances rush hour.

        “But is it wide enough for new bus lanes? Nah, they’ll just paint an existing lane red”

        That’s what we understand the city will do.

        “How will congestion get with the removal of some lanes?”

        Who cares whether cars are congested? They’re doing it to themselves. Buses will bypass the congestion. Some cars will find alternate routes or the trips will vanish.

        “Will this increase ridership on the L8 or will it make it even more late than it already is?”

        It will speed up the buses significantly, and thus increase ridership.

        Of course, “significantly” demands on how many blocks of bus lanes they paint and where. That’s what the study April will tell us. I assume that since the mayor is prioritizing bus thoroughput on Denny, SDOT will deliver a smart proposal.

      5. @scooby

        There was a study last year about adding bus lanes on Denny way already. It has more information if you’d like to know more. Generally yes the route 8 bus would be faster but also the cars would take longer to go east Denny way.

        Is there something specific you wanted to know

      6. “Who cares whether cars are congested? They’re doing it to themselves.”

        And let’s be clear:

        The reason for the congestion is the Interstate 5 congestion. You could demolish all of Lake Union to build car storage lanes, and Denny and Mercer would still be congested because the Interstate 5 / SR 520 interchange is only able to handle so much traffic.

      7. Why waste money painting Denny with bus lanes when bus service is planned to be abolished on it anyway?

        What gave you the idea they would abandon service on Denny? That would be silly. Even with the terrible congestion it is one of the most productive transit corridors. Are you thinking about a gondola or a “Metro 8 Subway”? If so, there has been no serious work on either one.

      8. How will congestion get with the removal of some lanes?

        It will reduce congestion for the bus. That is the point.

        Will this increase ridership on the L8 or will it make it even more late than it already is?

        The bus will be faster and more reliable which means ridership will increase.

        Think about it.

        I did. It is pretty obvious. Bus lanes and BAT lanes make buses faster. Even the existing bus lane makes the 8 faster, it just isn’t enough.

      9. My point is that the removal of some lanes might cause congestion for cars that could also potentially affect the bus (despite travelling on dedicated lanes) because of how congested the intersections could get but… If we add a bus lane, that would increase reliability which means more riders may take it. There have been proposals to move the 8 on Harrison/Republican/Mercer, but I don’t think that would be good especially for Denny.

      10. “The reason for the congestion is the Interstate 5 congestion.”

        It’s lots of things. Big ones include:

        – There are no faster east-west streets between Aurora and I-5 until well north of Green Lake. Mercer and Denny are the go to streets. So even if a driver isn’t avoiding the I5/520 interchange it’s still a factor.

        – Mercer’s ridiculously hostile width along with pedestrian crossing time makes for long signal cycles.

        There are no easy or low-cost solutions for these two problems. And Seattle spent a ton of money on Mercer in the past 15 years.

        And as much as Link through South Lake Union is a great addition, it won’t open for at least 15-20 years and there’s not even funds to build that. ST seems intent on building West Seattle Link no matter what and there’s not enough funds to build DSTT2 any further north than Westlake.

        There’s no political interest anywhere to expand street capacity. And any new lane capacity built will be congested almost from day 1.

        Seattle city government was so eager to develop SLU that they did not plan a good system — and they missed setting up any sort of developer fees to go to transportation too.

        The best outcome for someone is simply to not move there. Prior decisions over a few decades have combined to create this congestion nightmare — and it’s always harder to repair mistakes and oversights once the area gets new buildings.

      11. “What gave you the idea they would abandon service on Denny?”

        SDOT’s plans to upgrade Harrison Street to be a transit corridor and shift some or all the future-restructure Denny Way routes to it. SDOT has been speaking out of both sides of its mouth on whether bus routes will be on Harrison or Denny in the future, or some routes on one and others on the other, and whether the 8 would remain on Denny or move to Harrison. Every time we’ve asked for clarification, we’ve never gotten a clear answer, just that “Routes might move, but we’re not sure yet or which ones”. It has never explained why routes need to move to Harrison or be split between the two streets, or what criteria it would use to decide which route goes on which street, or where the 8 will be.

      12. SDOT’s plans to upgrade Harrison Street to be a transit corridor and shift some or all the future-restructure Denny Way routes to it.

        SDOT has suggested Harrison be a transit corridor since well before they removed the viaduct. This is from 2012. But that doesn’t mean they would move the 8. Doing so would be problematic, to say the least. You would have two choices:

        1) Abandon most of Denny. This means the bus would go on Mercer between Queen Anne Avenue and at least 5th. Then it would go down 5th and go over on Harrison until Fairview before doglegging again onto Denny. This would change the nature of the 8 and leave a good chunk of the area without east-west transit.

        2) Have the bus detour onto Harrison and then back. In this case the bus would go north on 5th as well as Fairview. This might save some time during peak but it would slow the bus considerably outside of peak, given all the turns.

        Frankly this is a silly idea.

        In contrast, running buses on Harrison *and* Denny is rather intuitive. The current Metro 8 routing between Queen Anne Avenue and MLK is obvious. It is the first east-west street to the north of the shoreline grid. You cover as much of the east-west area as possible. You have no turns for that segment. Complimenting that bus with another east-west bus to the north is obvious as well. Mercer is an obvious option, given the line distance between it and Denny. But Mercer is close to Lake Union. You also can’t keep going east on Mercer — you run into the freeway. You have to dogleg south anyway. Republican has better spacing but that doesn’t cross SR-99. So a dogleg on Harrison — a designated transit street — is appropriate. To the west you can follow Mercer or Roy. Roy provides better coverage although either could work.

        Thus you have two somewhat parallel corridors. The existing one on Denny and a stair-stepping route like so. These routes make sense, even if traffic isn’t an issue. The fact that latter one would benefit from the transit street for Harrison is a bonus. It certainly doesn’t mean that anyone is seriously considering getting rid of bus service on Denny.

        Speaking of the two corridors, the stair-stepping one is worth further consideration. Note that I have ended it at Fairview & Denny. That is because it really doesn’t make sense to go east at that point. Not when you can go south by simply going straight. By going south the bus would eventually follow Boren, like so. Notice how the bus goes essentially the same direction the entire time (southwest) despite several turns. So not only does it avoid an extra turn at Denny it complements the other route and the overall network.

      13. @Ross

        It was shown on a couple pdfs/PowerPoints of moving the route 8 to harrison. Sdot and king county just stopped showing the reroute because of community feedback but as far as I can telll that is still the plan

      14. My point is that the removal of some lanes might cause congestion for cars that could also potentially affect the bus

        Theoretically you could say that about every bus, BAT and HOV lane in existence. But in this case you are the one making the claim. How, specifically, would it do that?

      15. @WL — Yeah, I didn’t mean to submit the comment before double checking. Turns out they have considered it. Note this Urbanist article regarding the work on Harrison:

        “Metro and SDOT have made substantial investments to improve Route 8 reliability in the last five years and Metro remains commited to providing bus service on Denny Way,” an FAQ posted to SDOT’s project website states. “Shifting Route 8 to the Harrison and Mercer corridor is only one of several potential options to utilize an additional east-west pathway for buses through South Lake Union and Uptown. Before the corridor is ready for service in 2028, Metro will evaluate different service options to determine what routes will operate in the new corridor.”

        So yeah, it is a stupid idea but it made the list of options. A more recent article clearly shows the 8 on Denny (see diagram).

        Then there is the funding application for the work on Harrison (which was the basis for The Urbanist article):

        There is high demand for east-west bus service in the project area as illustrated by Metro’s Route 8 all day, frequent, high-ridership service on Queen Anne Ave N, 1st Ave N, and Denny Way. … A Harrison St transit corridor would provide an additional east-west pathway for buses to travel reliably across South Lake Union (SLU)

        (Emphasis mine.) In other words, the Harrison corridor would be in addition to the corridor for Denny. Thus there would be value in BAT lanes for Denny, even if the routing changes. Bus service on Denny is also consistent with the Metro Connects Plan. The idea that “bus service is planned to be abolished on it anyway” is absurd.

      16. Ross, I like the “stair step” and agree that it’s a natural for the north end of a Boren route. But it needs a connection to Link so maybe that’s an argument for making it a limited-stop overlay service to Judkins Park and Mt. Baker south of Boren and Jackson? If Rapid Ride R ever comes, there will be fewer stops on Ranier anyway.

      17. “Abandon most of Denny. This means the bus would go on Mercer between Queen Anne Avenue and at least 5th. Then it would go down 5th and go over on Harrison until Fairview before doglegging again onto Denny.”

        Yet that’s what SDOT has proposed anyway. The last time Denny Way upgrades came up, we tried to get a statement from SDOT committing to keeping the 8 on Denny, but it just said it might be on Harrison or might be on Denny: it hadn’t decided and was keeping its options open.

        But there’s a new mayor in town, who campaigned on bus lanes on Denny Way and is making it an early deliverable. So maybe she’ll get SDOT to abandon the Harrison idea, because it wouldn’t make sense to put so much effort into bus lanes on Denny and then shift buses away from it.

        The problem is Denny Way’s speed. This can be addressed with bus lanes. If we have bus lanes, there’s no reason for buses to be shy of using it.

    1. I agree, the idea of streetcars in Seattle has gone too far. No city connector, let’s throw that idea in the trash bin and convert 1st Ave into a transit mall better than 3rd Ave ever could. There is no need for a Westlake to Capitol Hill streetcar when you know that bus lanes are coming to bridge that slow gap that involves crossing a freeway and going through a quicksand street. I would sure love bus lanes on Jackson though.

    2. Replacing both streetcars with buses would be a big improvement in transit mobility but it would be difficult politically. People are attracted to the streetcars for reasons that have little to do with transit. I would focus on replacing the South Lake Union Streetcar, which would be better for transit and cyclists (https://seattletransitblog.com/2024/10/04/replacing-the-south-lake-union-streetcar/). This should be the highest priority and it really shouldn’t be that difficult. It is rare that both cyclists and transit riders come out ahead with a project but they would in this case.

      Replacing the First Hill streetcar would be more difficult. It is also more important from a transit perspective. They aren’t like the George Benson Waterfront Streetcars (which were largely for show). This actually makes it trickier. It means some tough choices, such as:

      1) Get rid of the streetcar and replace it with better bus service. It wouldn’t be hard to do this. Once you replace the streetcars it becomes much easier to add bus/BAT lanes on both Jackson and Broadway.

      2) Leave the streetcar but run them infrequently. Thus you would essentially replace the streetcars from a practical standpoint but people could still ride them. You could add BAT lanes on Jackson and if the streetcar is stuck there, so be it. It would be tougher to deal with Broadway.

      3) Just muddle along with the streetcar.

    3. “streetcar_is_blocked_by_a_vacant_police_car”

      How often does this happen though? People talk like streetcar tracks are blocked by disabled cars all day every day, when it may only be once a month or twice a year. It seems like overkill to categorically exclude trams because of that.

      And in this case it can be argued that the police have priority, and everything else has to stop around them anyway.

      The real reason streetcars don’t make sense is the definition of “streetcar” in Seattle: “running mostly in mixed traffic”, in contrast to light rail which runs “mostly in dedicated lanes or grade-separated”. That tells you right there that this kind of streetcar is a long-obsolete paradigm that was discarded almost a century ago.

      People want rail because it’s faster, better, and higher-capacity than the bus route it replaces or could theoretically be there. If streetcars cost more to procure and operate than buses, and are no faster than the bus route — or are even slower, then that’s the worst of both worlds. That’s the reason to oppose Seattle streetcars or expanding the streetcar network.

      So don’t build the CC on 1st Avenue, and retire the SLU streetcar (the C, 40, and nearby 62 and 70 serve that area better and beyond). The First Hill streetcar can possibly stay because it is getting a modest ridership, it addresses L-shaped Broadway-Jackson trips, and it’s already built. But its presence makes it harder to configure bus-priority lanes, and its stations are at different locations than bus stops, so even if the streetcar and a bus route both go to your destination, you can’t wait at one stop and take the first one that comes, you have to decide ahead of time which stop to go to and wait for that one.

    4. Single incidents happen with any transit. I don’t think this incidentschanges the larger streetcar issue. If anything, it just says to me that SPD needs to train officers better about where they park cars and they probably need more training about transit operations in general.

      I see the basic problem with the streetcar lines are more about hampering transit vehicle flow generally than their low ridership . It’s just not compatible with high frequency bus transit corridors when forced into a mixed flow or one lane per direction street.

      The concept has a major problem: speed. It’s stupidly slow. There were many factors that led to that.

      The real tragedy to me — if the speed can be improved — to the FHSC is that I’ve felt like it should have continued to Judkins Park or Mt Baker. It could have run down Rainier, or jogged to the east (20th or 23rd) and then turned south. There remains no direct bus between the Rainier corridor and Harborview south of Walker St while Jackson St gets served by multiple routes that are seemingly redundant.

      It could even have been a surface version of Metro 8 had it also had one-way tracks on Pike and Pine connecting the two lines. Imagine a line from SLU on Westlake to Pike-Pine to Broadway to Yesler to 23rd to Rainier to end at Mt Baker Station. It probably would have even needed longer trains to handle the demand.

      Meanwhile a cable pulled solution could connect Harborview and CID in 4 minutes. The FHSC takes 15 minutes to make that trip.

      1. The reason the First Hill streetcar turns is part of the initial motivation was to connect Sounder commuters to First Hill jobs. There was no similar push to connect Rainier Valley commuters to First Hill jobs, because Sounder is hundreds of people each train from three subareas, so it was seen as something that deserves a streetcar if the Link First Hill station wouldn’t be available.

      2. “The reason the First Hill streetcar turns is part of the initial motivation was to connect Sounder commuters to First Hill jobs.”

        You do realize that streetcars are not a good use of transit money if it’s primarily for merely Sounder commuters a few hours in one direction, right? And that many medical jobs have different work hours than Sounder trains run anyway? And that the streetcar capacity is no higher than an articulated bus?

        This tugs at a basic regional issue, which is that too many people who don’t fully understand why to choose an appropriate transit technologies are pushing for suboptimal investments.

      3. ““The reason the First Hill streetcar turns is part of the initial motivation was to connect Sounder commuters to First Hill jobs.”

        “You do realize that streetcars are not a good use of transit money if it’s primarily for merely Sounder commuters a few hours in one direction, right? And that many medical jobs have different work hours than Sounder trains run anyway? And that the streetcar capacity is no higher than an articulated bus?”

        That’s what I said: streetcars are not a good use of transit money. And Sounder operates in only 4 out of the 12 hours the streetcar runs, and not on weekends. I was just quoting why ST and Seattle wanted the streetcar so badly. They’re the decision-makers. Another reason was “First Hill wanted rail”, and argued that it deserved it because the promised First Hill Link station was deleted.

  5. I would add dropping the RRFP and LIFT fares on the monorail from the current $2 to $1 to the City’s equity to-do list.

    Every other service that accepts ORCA passes charges $1 or less for LIFT cardholders.

    1. Are you serious? I would lower adult fares by a dollar and abolish youth fares on the monorail to fit in with Metro and ST.

      Are they treating the monorail as an amusement ride or a public transit method?

      I’ll assume they’re going for both, though adjusting fares on the monorail to match with light rail and buses would be going for the low hanging fruit.

      1. Seattle owns the monorail, but contracts operations to a for-profit company. So the contract negotiations and rate changes work around that profit requirement. Seattle could position the monorail as regular transit and charge the same fare and accept transfers, and subsidize it like buses, or turn over operations to Metro (who did operate it for decades) to avoid the profit overhead. But it has chosen not to. And a switch could most effectively be done only when the multi-year contract comes up for renewal.

      2. Regular fares aren’t really an equity issue. I agree that the regular fare ought to match Link, FWIW, for the general ridership experience.

        Reduced-fare riders with passes face a 100% upcharge on the monorail, while regular-fare riders face a 33% upcharge. I believe lowering the reduced fares to match the region would have the most positive impact on ridership.

        At any rate, I don’t see the City subsidizing regular monorail fares without subsidizing reduced monorail fares.

  6. Ross has suggested a “westside crossing” of the Ship Canal in order to allow BLE to curve back eastward in order to continue to the U District. We all have heard about “the big pipe under Shilshole Bay” which may or may not be an obstruction for such a westside crossing.

    Here are links to two articles, one about the huge storage tunnel that’s under construction right now along the north side of the Ship Canal from about 22nd NW east to about Stone Way. [https://www.seattle.gov/utilities/neighborhood-projects/ship-canal#ballard]

    The other is about the “Ballard Siphon” which is, I believe, the “big pipe” about which we have been concerned: [https://kingcounty.gov/en/dept/dnrp/waste-services/wastewater-treatment/capital-projects/completed/ballard-siphon-replacement]

    The good news is that “the big pipe” crosses the Ship Canal at close to a right angle, spanning from 20th NW and Shilshole on the Ballard side to 23rd West just north of Commodore Way on the Magnolia side. It doesn’t run down the middle of Shilshole Bay, so its span of disruption isn’t very wide.

    Fortunately, the new siphon “is more than 120 feet underground”, though what zero feet “underground” would be is not specified in the article. There is a pair of older siphons just a few yards beneath the bottom of Shilshole bay in the same alignment, so a train tunnel could almost certainly pass under them and over the new siphon.

    Whether Seattle Engineering would stand for that is an open question.

    However, the storage tunnel is a gigantic obstacle and runs alongside the north bank all the way from about 23rd NW essentially to Gasworks Park. It is 108 inches in diameter (nine feet) and is designed to be a holding facility of many millions of gallons of waste and storm water so that a big storm doesn’t overwhelm the treatment plant.

    This tunnel is a potential hazard to any north-south tunnel east of 23rd NW. The train tunnel would have to over-run it, I expect, because the enormous weight of that much water — and the tunnel itself of course — would mean that under-running it would require quite a lot of overhead clearance to spread the burden. That means that the train tunnel would have to “thread the needle” between the top of the sewage tunnel and the surface.

    I find it somewhat interesting that the article on the tunnel project does not refer to the “Ballard Regulator” on its project map, though it appears to me that the text in the article about the Siphons implies that they are the means by which wastewater is conveyed to West Point Treatment Plant. So why isn’t the Regulator connected to the huge storage facility?

    There appears to be a “tail” of “conveyance pipe” that goes a few blocks west of the Ballard Pumping Station and just ends at NW 56th and 28th NW. I think that means that there is an existing sewer main running north-south along 28th NW that will be used to convey the water from the storage tunnel to West Point.

    It is pretty strange that the City built the new siphon in 2014 and now, just a decade later, appears to be at least in part, bypassing it.

    Whatever happens with “BLE”, the new storage tunnel is an important impediment. The article states that it will be forty to eighty feet underground, and the Ship Canal is about fifteen feet deep, so at a point where the storage tunnel is at its shallowest, it would be a major impediment to a tunnel under-running the Ship Canal a half block south.

    When we discuss BLE in the future, it would be a good idea to remember these articles.

    1. P.S. To be clear, I agree with Ross. It’s a much better idea than a north-south station, even on 15th NW.

Comments are closed.