A few minor changes to details in the Mercer Island Station Open House Report have been made, to wit:
1: Paul Cornish is a project manager in civil engineering at Sound Transit.
2: While East Link construction will begin in 2015, Mercer Island Station construction begins in 2016, when the center lanes of I-90 are scheduled to be closed.
3: Hewitt and his firm are handling the design for the station at this point.
4: Paul Bennett is also the name of a Sound Transit engineer, so the post was edited to avoid confusion.
Finally, an extra sentence concerning the acoustic walls was added.