East Link Connections: bus changes in the south subarea

Bus changes proposed for Renton, Newcastle, Factoria, and Eastgate

With the East Link Connections project underway, Sound Transit and Metro have presented their first service proposals as part of the East Link Connections survey. The opening of East Link will be a huge event, and will transform what transit service looks like not just crossing Lake Washington, but how neighboring regions are connected. The south subarea of the East Link Connections study area includes Renton, Newcastle, Factoria, and Eastgate. Though not as significant as in other areas, the changes in this area nonetheless improves transit access overall, with brand new all-day coverage, more direct service to Bellevue College, and consolidation of peak-hour service.

Continue reading “East Link Connections: bus changes in the south subarea”

Sound Transit begins new fare ambassador pilot

Sound Transit:

The Fare Ambassador Pilot Program grew out of passenger feedback and community engagement that expressed discomfort with fare enforcement officers who resemble law enforcement. In response, Fare Ambassadors wear bright yellow caps, and carry yellow messenger bags that make them easy to recognize. Their focus is on passenger education and customer service rather than enforcement, with particular emphasis on how to purchase ORCA cards and passes and how income-eligible passengers can obtain ORCA LIFT cards.

“We want all passengers to feel comfortable asking Fare Ambassadors for assistance, whether they need help getting to their destination, or they’re having trouble purchasing fare,” said Sound Transit Chief Passenger Experience and Innovation Officer Russ Arnold. “Fare Ambassadors are here to provide help.”

Riders can expect to see the yellow caps starting this week. Read our previous coverage of fare enforcement here.

Eastside transit restructure kicks off

“Restructure” and “transfer” are hot transit words in the Pacific Northwest, with all eyes focused on Northgate Link opening October 2nd. A new Link extension comes with a significant restructure for transit services provided by Community Transit, Sound Transit, and King County Metro.

During these exciting times for regional transit, Sound Transit and Metro have begun their public-facing process of restructuring routes and creating new transfers between East Link and Redmond Link (E&R Link) when they come into service in 2023 and 2024, respectively. The very first public survey, available here, primes our communities in determining what our future transit network looks like for years to come.

Continue reading “Eastside transit restructure kicks off”

News roundup: June highlights

An Everett Transit Bus at Everett Station in the Night

Some highlights from June that we never mentioned here:

This is an open thread.

About that heat dome

HERE COMES THE NEW @SOUNDTRANSIT S700 - Widescreen
AvgeekJoe/Flickr

Many of us have tried to forget the historic heat of Late June. Sadly, even Link trains had to reduce speeds. Areas south of the DSTT ran as slow as 20mph and caused delays of 3-10 minutes. This surprised me: elsewhere, Light Rail often operates in temperatures well in excess of Late June’s. ST’s John Gallagher explains:

There are basically two things going on. One is that extreme heat can cause the rails to expand and change shape. The other is that the turnbuckles that keep the overheard catenary wires taut can expand, causing the wires to sag a bit. Out of caution, we operate Link at lower speeds when it’s very hot to ensure that neither of these problems interfere with service should they occur. 

Mr. Gallagher says that ST has already added air conditioning to substations to make them more resilient. New track extensions include a spring system on the overhead wires to replace the balance weights on the original track, which should improve heat resistance. He adds that ST will conduct a review to see if there are other changes necessary for a warming world.

Without overreacting to a single instance of record heat, all trends suggest that there are more and more extreme heat events coming, and ST should look to mimic systems like Phoenix that already deal with those conditions.

News Roundup: coming back

This is an open thread

Know any good writers?

As you may have noticed, August was extra quiet here at STB. This is the result of combination of factors hitting all at once, including some of our contributors moving on to other priorities.

But September is here, Northgate Link is less than 30 days away, and we’re back, or at least we aim to be. But we need your help. If you have ever thought “hey, it might be interesting to write something for STB,” now is the time! Drop us an email, contact@seattletransitblog.wpcomstaging.com.

PS: to clarify, we’re mostly interested right now in volunteer / unpaid submissions, although we are ramping up our ability to offer paid freelance assignments as well. More to say on that in the future!