Kirkland’s Compromise ST3 Offer

One reason to favor BRT is that the nearest proposed light rail station would be 0.5 miles from downtown and surrounded by low-density uses.

On Tuesday evening, the Kirkland City Council approved a letter to the Sound Transit Board offering a compromise to resolve the impasse over transit on the Cross-Kirkland Corridor (CKC). The letter (significantly revised from the draft Zach reported on Saturday) seeks an investment in trail access from Kirkland to the Wilburton Link Station and Kingsgate BRT station. These trails would be designed to accommodate transit, carefully signaling the integration of transit and other uses on the corridor. At the same time, ST3 would fund planning and development for high-capacity transit on the corridor, leading to a record of decision for transit in the next regional package.

The “Kirkland Compromise” includes:

  • A Regional Trail connection from Sound Transit’s Totem Lake terminus to Sound Transit’s Wilburton Station in Bellevue along the CKC and ERC. This would be a fully developed permanent trail built to the specifications of the Cross-Kirkland Corridor Master Plan in Kirkland and King County’s ERC Regional Trail Master Plan in Bellevue.
  • Trail planning aligned with transit planning to clearly define a future transit envelope in the CKC and ERC in Bellevue. Planning the trail and transit together ensure the trail would not be disrupted in the future.
  • Design money allocated for transit design on the CKC/ERC to achieve a record of decision.
  • BRT on I-405 to include an inline station at NE 85th along with transit service directly connecting downtown Kirkland to Redmond along NE 85th in exclusive lanes.
Continue reading “Kirkland’s Compromise ST3 Offer”

ST3: Kirkland-Bellevue Bus Rapid Transit

At the December 4 Board workshop, Sound Transit staff shared their latest study of Bus Rapid Transit along the Eastside Rail Corridor between Bellevue and Kirkland. The study parameters incorporate many suggestions from the City of Kirkland. Ten miles of mostly at-grade BRT guideway connect nine at-grade stations: three are in the Totem Lake area, two around downtown Kirkland, one at South Kirkland, and three more in Bellevue.

E06_MapThe corridor BRT is well-integrated with regional services. It would connect to I-405 BRT at Kingsgate/NE 128th, to East Link LRT at Wilburton Station, and to regional bus services at the Bellevue Transit Center. An alternative configuration at Wilburton might have an elevated station.

The study acknowledges the need to accommodate the existing trail on the Cross-Kirkland Corridor, and a future trail on the Eastside Rail Corridor in Bellevue. It specifies that the rail would be on the east of the corridor with trail uses to the west.

Continue reading “ST3: Kirkland-Bellevue Bus Rapid Transit”