I would say they did very well in 2007 with a lot completed and accomplished. This is only adding to the State Auditors findings that ST is a well organized and set agency with the goal of bringing gridlock to as minimal as possible.

http://www.soundtransit.org/x7158.xml

2007 Accomplishments

Download the 2007 Milestones Year-end report (PDF, 2 MB) >>>

Sounder Commuter Rail Service

• Started a reverse Sounder commute between Seattle and Tacoma.
• Started a new Tacoma-to-Seattle run.
• Started a third Sounder North line trip.
• Broke ground on the Lakewood Station.
• Broke ground on the Mukilteo Station.

ST Express Regional Bus Service

• Opened the Totem Lake Freeway Station.
• Opened the Canyon Park Freeway Station.
• Broke ground on the I-90 Two Way Transit and HOV lanes Stage 1 project.
• Broke ground on the Redmond Transit Center.
• Broke ground on the Redmond Way transit improvements.
• Broke ground on the Totem Lake Transit Center.
• Broke ground on the North Everett/College Station Transit Center.
• Federal grant awarded for senior housing development at Federal Way Transit Center.

Link Light Rail Service

• Opened the Link light rail Operations & Maintenance Facility.
• Broke through the first Beacon Hill East Portal with the Link tunnel boring machine.
• Completed excavating the Beacon Hill Station.
• Completed Tukwila International Blvd Station.
• Installed Tacoma Link stations closed-circuit television system.
• Completed University Link light rail’s design and cost estimate.
• Finished resurfacing Pine Street in downtown Seattle.
• Reached agreement with University of Washington on University Link.
• Reopened the Downtown Seattle Transit Tunnel for bus service. (1 Week Late)
• Reached 10 miles of continuous rail laid from Tukwila through the Rainier Valley.
• Began work on the SeaTac/Airport Station.
• Began final assembly of Link light rail trains. (In Everett)
• Began testing light rail trains. (Between DSTT and Operations and Maintenance Facility)

Agency-wide

• Carried about 14 million passengers combined on trains and buses
• Reached 73 million in total lifetime ridership.
• Completed Smart Card beta test. (Orca card)
• Board adopted final Sound Transit 2 package for expansion of the regional transit system.
• Public voted on Sound Transit 2 package. (Failed)
• State Performance Audit released; ninth consecutive clean independent audit released.

Let’s hope for the same performance for 2008!