Podcast #100: Thinking Bigger
Author and journalist Matthew Yglesias joins us to discuss his book, One Billion Americans: The Case for Thinking Bigger.
This is an open thread. Beginning today, January 11, 2021, the automated photo enforcement system on the Spokane St Swing Bridge (low bridge) will turn on, and unauthorized low bridge users will be subject to a $75 citation for every trip across the low bridge. To keep the low bridge clear for emergency vehicles – as well as transit and heavy freight – we’re saying, “don’t go low.” Instead, please use alternate routes when traveling to and from West Seattle by car. We will be monitoring low bridge traffic volumes in early 2021, and the data from January and future months will inform whether we can expand access. See our webpage for more details. West Seattle folks – let us know in the comments if anything’s improved. Sound Transit has revealed sharply higher capital cost estimates for several ST3 projects that are in development but not yet baselined (i.e. the Board has not yet selected the alternative to be built or finalized the cost and schedule estimates). The worst news is in Seattle. The West Seattle to Ballard Link extension (WSBLE) is now expected to come in at $12.1 to $12.6 billion for the preferred elevated alignments, $5.0 to $5.5 billion higher than projected in ST3 (all 2019 $). $4 billion of that cost increase has emerged in just the last year as the initial alternatives selected for the EIS have been fleshed out. The news was delivered to the Sound Transit Executive Committee earlier today, and further detailed in a memo released after the meeting. Cumulatively, the cost estimate increases across all projects run to $7.9 billion in 2019 dollars. That would be about $12 billion in year-of-expenditure dollars on current project schedules, though those schedules will be inevitably extended. If realized, such costs would make it very difficult for Sound Transit to complete Link extensions to both West Seattle and Ballard anywhere close to the ST3 timeframe, even if Seattle forgoes more expensive tunneling and other options that could add up to $1.7 billion more to the price tag (though the relative cost of below-ground vs above-ground shifts in favor of tunnels as above-ground land acquisition becomes more expensive). This is an open thread. Ashley Archibald reports some locals aren’t so sad Metro is shelving RapidRide R (Rainier): Much of the Rainier Valley community “doesn’t really want the RapidRide R,” Kidde [of Rainier Valley Greenways] said, adding that they don’t like the reduction in the number of stops, the removal of the Prentice loop at the south end of the route nor the RapidRide-style fare enforcement where officers check payment on the bus. Advocates fear that the new fare enforcement will result in disproportionate enforcement against people of color. Important source material includes longtime 7 driver Nathan Vass’ essay opposing the R line. It has some valuable firsthand testimony and some ideas I completely agree with. It also has not a lot of data and a weird assertion that RapidRide “counts as gentrification.” Notably, Metro is going ahead with the BAT lanes, probably the most important substantive improvement. But really, what is RapidRide? 2020 was not… great, but 2021 will be a major year for transit openings and restructuring:News roundup: resuming
Redmond hiring a transportation manager [UPDATE: this position closed in September]West Seattle camera enforcement coming this week
Weekend open thread: Traditional vs suburban development
West Seattle-Ballard Link costs revised more than $4 billion higher

News roundup: about right
What’s the point of RapidRide?

Weekend open thread: Moynihan Train Hall
What to watch for: 2021
