Seattle Subway: the danger of tunnel vision

For the next ten weeks, Link riders will have to contend with infrequent trains, a forced transfer in Pioneer Square, and weekend closures to prepare for Northgate and East Link Expansions. These delays and closures could have been avoided by building for future expansion originally rather than planning and authorizing the system piecemeal. This time, the costs and impacts of the rework are relatively minor, but the consequences of this approach will be severe for future expansions unless the course is corrected.

Before Link opened in July of 2009, Sound Transit closed the tunnel to install tracks, power, and systems in preparation for bus/train operations. Plans were considered for expansions to Northgate and east to Bellevue, but the ballot measure to authorize that expansion, ST2, didn’t pass until November of 2008. Not enough time to plan and execute changes to future-proof the tunnel for expansion.

Continue reading “Seattle Subway: the danger of tunnel vision” | 83 comments

Cyclists to bear brunt of light rail operational changes, starting this morning

video by Robert Svercl

Connect 2020‘s first full closure of the downtown transit tunnel is behind us. Now, we settle in for 10 weeks of tighter, more crushloaded trains during peak periods, longer waiting time especially during peak, a mid-line forced transfer across a temporary center platform at Pioneer Square Station, and a ban on bikes on the train between University Street Station and International District / Chinatown Station.

For the duration of Connect 2020, all trains will be four cars, and will come roughly every 12 minutes (and hopefully less “roughly” as the days progress). This means there will be an increase in off-peak capacity, and a significant decrease in peak-hour capacity. Passengers in the downtown tunnel may also have to use a different platform than they are used to, and it may switch from time to time. Signage and staff will be on hand to point the way, along with automated announcements. Please spread out along the entire length of the platform to fill the four train cars evenly, and stay out of the priority seating area, so wheelchairs users, riders in scooters, and others who need it can board quickly.

King County Metro is helping out by adding more buses on routes 7, 36, 48, 49, and 70, as alternatives to taking Link.

Continue reading “Cyclists to bear brunt of light rail operational changes, starting this morning” | 50 comments

Link FREE this weekend for tunnel closure

The ten-week period of construction work to install East Link track and switches in International-District/Chinatown Station, a project Sound Transit has dubbed “Connect 2020“, has arrived.

Operational nuisances begin today and tomorrow with a full closure of the Downtown Seattle Transit Tunnel. Just like happened a couple weekends last fall, shuttles will run every 7 minutes between SODO Station and Capitol Hill Station, and serve temporary bus stops at each station in between. Link will run every 10 minutes on tunnel closure days.

Both the shuttles and Link will be free all weekend. ST staff will be available at both Capitol Hill Station and SODO Station to answer questions.

Continue reading “Link FREE this weekend for tunnel closure” | 11 comments

News roundup: not afraid

This is an open thread.

61 comments

Looking forward to 2020 and beyond

A new light rail car for a new decade (AtomicTaco/Flickr)

With a decade full of dramatic changes to Seattle and the region as a whole behind us, it’s time to look ahead to what the 2020s has in store. Between completing the bulk of light rail expansion under ST2, starting work on ST3 projects, and figuring out the new region that springs forth from the new transit landscape, it will be an exciting time to be here.

Here’s a rundown of things to look forward to at the start of the decade:

Connect 2020

Pioneer Square Station, the focal point of Connect 2020

Beginning this weekend, there will be 10 weeks of major disruptions for Link riders passing through Downtown Seattle as part of Connect 2020. While riders will get to enjoy four-car trains, they will be running every 12 minutes because of the single-tracked section in downtown, leading to an overall capacity decrease and forced transfers at Pioneer Square Station. This small bit of pain and annoyance is necessary to connect East Link into the system.

We’ll have a full survival guide later this week, but do note that Link from Capitol Hill to SODO will be fully shut down this weekend and replaced with shuttle buses. People with bicycles will not be able to ride Link trains during the weekday disruptions between University Street and International District/Chinatown stations.

Continue reading “Looking forward to 2020 and beyond” | 79 comments

Intercity Transit rolls out fare freedom, and schools King County on performance metrics

Happy New Year!

Today, Thurston County Intercity Transit is embarking on a five-year pilot program to run without fares. That means both their fixed-route buses and paratransit (which, by federal law, cannot charge more than twice the fixed-route fare) will be free.

This experiment is not a dive off the ideological deep end, but, rather, the result of using proper performance metrics. From IT’s fare page:

Fares account for less than 2 percent of our net revenue. After considering the capital and operational costs of a new system, the difference is negligible. The opportunity to offer faster service, increase ridership, improved access and equity is a far better investment. 

It seems that Intercity Transit was following my advice to use the proper performance metric — net fare revenue — or that that performance metric is so obvious that many wise minds think alike. (I’m not necessarily counting myself as one of the wise guys.)

King County Metro continues to base fare policy on the much less useful datapoint of gross fare revenue.

Continue reading “Intercity Transit rolls out fare freedom, and schools King County on performance metrics” | 39 comments

Most read & commented STB posts of 2019

Buses exited the Downtown Seattle Transit Tunnel for the last time in March 2019 (image: Oran Viriyincy)

On the eve of the new year, it’s time to review the old. In 2019, we dove deeper into ST3 planning. Transit advocates mused on ST4. As the year drew to a close, we also contended with a possible reduction in funding for already approved projects and current bus service in Seattle.

In descending order, our most read posts of the year are:

It’s time to start work on ST4 by Seattle Subway (June 25). Seattle Subway would like you to support a 2024 ballot measure for more rail in Seattle. “Traffic is over – if you want it”.

Build the Aurora Line by Seattle Subway (August 27). Where would those new rail lines go? Seattle Subway and Ryan DiRaimo make the case for an ST4 Aurora Ave line.

ORCA Pod Welcomes Monorail by Brent White (March 11). Despite our past urging, the Seattle monorail had too long remained outside the Orca family. No more. The change took effect in October.

Continue reading “Most read & commented STB posts of 2019” | 27 comments

ShareNow ceasing operations, Limebike pauses

Car2Go in Pioneer Square
Shane in the City/Flickr

Geekwire reports that the carshare company will shut down across North America in February. Cars will start disappearing well before then.

This step is not surprising. Lime recently shut down their similar Limepod service. ShareNow itself is a merger from weakness of two previous competitors. Recent tinkering with the fee structure was a likely signal of operational problems. Only Zipcar, with a membership fee and slightly longer rental periods, remains.

Meanwhile, Limebike is using the December expiry of its permit to punt on the unprofitable winter season, coming back in the Spring when Seattle starts allowing electric scooters. If other cities’ experience is an indication, the scooters will dominate and the bikes will wind down. Only Jump remains as a bikeshare option this winter.

Continue reading “ShareNow ceasing operations, Limebike pauses” | 47 comments