Kirkland in ST3, and Beyond

caption
ST3 rail will terminate on the other side of this intersection in South Kirkland in 2041

The ST3 program is widely viewed as disappointing for Kirkland. The city wasn’t quite passed over: I-405 BRT will serve Totem Lake and NE 85th St in 2024, and rail will extend to South Kirkland in 2041. But most observers focus on the missed opportunity to connect Downtown Kirkland via the Eastside Rail Corridor. Why did this happen, and what are the implications?

It’s instructive to start at the beginning. In mid-2015, ST3 was anticipated as a 15-year package including rail to Redmond and BRT on I-405. Other Eastside rail investments would follow in ST4. Recognizing the risks of waiting, Kirkland developed a Bus Rapid Transit proposal with Sound Transit and Metro buses running in largely exclusive right-of-way along the ERC. The reduced capital costs, it was hoped, could fit within a 15-year program.

caption
Destinations that can be reached via transit/walking in one hour from Downtown Kirkland. ST2 and early improvements to the Metro network deliver more than the ST3 program. Source: King County Metro

As a 25-year program came into view, the calculus shifted to potentially include a rail line between Kirkland and Issaquah. But Kirkland’s study highlighted several advantages of a busway. It could serve more destinations including Seattle (with four times the demand of a Bellevue-Kirkland service). It connected more activity centers within Kirkland, and eased the challenge of serving Downtown Kirkland. A busway might better balance trail uses, though not enough to appease South Kirkland neighbors who were determined not to have any transit passing their homes.

Kirkland was convinced of the advantages of BRT on the Corridor, but other stakeholders were less supportive. Sound Transit, improbably, estimated only about as many riders on the BRT in 2040 as the corresponding Metro routes today, emphasizing time penalties of deviating off the corridor to serve denser areas. The tortured history of BRT “alternatives” to rail on the Eastside ensured transit lobby groups would be skeptical. Issaquah worried about the implications of Kirkland BRT for its own rail plans. Even Bellevue placed a greater emphasis on I-405 BRT as a major north-south connection.

Continue reading “Kirkland in ST3, and Beyond”

Bellevue’s Transportation Levy

bellevue_all_projects
Representative projects to be funded by the transportation levy. Map: City of Bellevue

Bellevue has a progressive transportation levy on the ballot next month that will step up investments in neighborhood safety and connections. The levy augments baseline spending in Bellevue’s Capital Improvement Plan, accelerating local projects that would otherwise wait many years for funding.

Bellevue is growing quickly, and the growth has been accompanied by increasing public demands for better non-motorized connectivity as well as local congestion relief. The upshot is an $800 million deficit between the 20-year list of capital projects and projected revenue, much of that in transportation. A particular need for funding to accelerate safety, connectivity, and neighborhood congestion projects was identified.

The proposed tax rate is 15 cents $1,000 assessed value. The median Bellevue homeowner would pay $96 annually (on an assessed value of $640,000). The measure yields $6.7 million, or an estimated $140 million over 20 years. A second, similarly sized, levy for fire facilities is also on the ballot.

While not a very large program (about one-third the size of the Move Seattle measure in per capita/year terms), the mix of projects is impressive. There are no large highway expansions. Major planned efforts to extend the arterial street system in the BelRed area to coincide with the completion of East Link (where the City will seek TIFIA funding) are not included.

This measure, rather, supplements baseline capital funding to address the backlog of small locally-oriented projects that would otherwise be built over decades. 223 projects are identified as candidates, and the city’s interactive map shows projects spanning every neighborhood in the city.

Some story boards from the Bellevue Transportation Department illustrate the range of what would be funded. Priorities include:

  • New sidewalks and trails will be accelerated. Bellevue’s CIP has a 30-year backlog of identified high-priority projects, many of which will be supported through the levy.
  • Neighborhood safety. Candidate projects include 84 locations for traffic calming, 12 school safety projects, and 55 pedestrian crossings.
  • Bicycle facilities with 52 identified projects to provide 57 miles of new or upgraded bike facilities citywide. Funding Bellevue’s Bicycle Rapid Implementation Program would expand the city’s network of bike routes from 107 to 128 miles, but more importantly would improve the quality of these routes, reducing unmarked shared facilities (wide lanes and shoulders) from 65 to 35 miles and adding 23 miles of separated bike lanes.
  • Enhanced technology, including LED streetlights, video monitoring and analysis of accidents and near misses, parking and driver information systems.
  • Neighborhood congestion, largely signals and intersection improvements. Notably, capacity is not being increased via added lanes or new roadway.
  • Sidewalk and trail maintenance. This mostly comprises repairs and maintenance to defective sidewalks and trails due to root heave or aging. The city would also sweep trails and streets more frequently.

The measure is City of Bellevue Proposition No. 2, “Levy for Neighborhood Safety, Connectivity, and Congestion”, and deserves your support.

Displacement is a Thing, Sometimes

20160825-img_9731_std
Highland Village Apartments in Bellevue. Photo by Author.

Sightline had an interesting report recently about displacement of older (presumably more affordable) homes by new development. They looked at 19 apartment complexes built in Seattle (all of the 8+ unit developments the King County Assessor considers as built in 2016). Those developments created 1,764 new homes while displacing only 21 older homes, a compelling 84-to-1 ratio. 12 developments on former commercial sites did not displace any older homes at all.

That’s great news, but what’s this? In Bellevue, the King County Housing Authority stepped in to buy a 76-unit apartment complex that was to be demolished for 87 town homes. Rents at Highland Village Apartments average $1,200 per month, well below the average Bellevue rent of $1,930. The KHCA spent $20 million to buy the complex, located on NE 8th St between Downtown Bellevue and Crossroads. The KHCA will now renovate the apartments, maintaining rents near their current level.

Before_After2
Before and after in Kirkland. The newer buildings are technically multifamily, but appeal to buyers in the single-family market. (Before: Google Street View, 2011. After: Photo by Author).

The Sightline report reminds us that development generally expands supply and is mostly good for affordability. But the story of Highland Village is hardly unique. It may be more typical in a certain kind of pricier suburban community. Highland Village look like hundreds of other older multifamily developments in this region. Two stories; on an arterial but not in downtown; surrounded by surface parking; in a low-rise neighborhood where the zoning will not permit much greater height or density (and perhaps not the market either). Rents are lower because the buildings are depreciated. Older small single family houses may get more sympathetic news coverage because they appeal to boomer nostalgia, but older multifamily units are the most affordable unsubsidized homes in most cities.

Like Highland Village, many older apartment buildings are ripe for redevelopment to higher-priced homes.

Continue reading “Displacement is a Thing, Sometimes”

I-405 Tolls Fund More Highway Capacity

I-405 near Canyon Park. Photo by SounderBruce
I-405 near Canyon Park. Photo by SounderBruce

While they remain controversial politically, the HOT lanes on I-405 between Bellevue and Lynnwood are increasingly popular with transit users and the drivers who use the lanes. Higher than forecast driver demand has led to higher toll revenues, and those revenues are being put to work to benefit drivers in the corridor. The first improvement is a 1.8 mile shoulder lane for general purpose traffic between Canyon Park and I-5. The improvements may also benefit transit users.

Shoulder lanes will be added in 2017 between SR 527 and I-5. Map: WSDoT
Shoulder lanes will be added in 2017 between SR 527 and I-5. Map: WSDOT

As demand has grown, average peak time toll rates have crept up from $1.75 in late 2015, to $2.40 in the first quarter, to $2.72 in the second. In June, the HOT lanes served 1.2 million vehicle trips, over 800,000 of those tolled. With higher prices and HOT lane volumes, WSDOT now anticipates revenues will exceed earlier forecasts by about $20 million per biennium.

The lanes have worked well for transit too, with Metro seeing 8.2% more riders. Average travel savings are 2.1 minutes in the AM and 5.8 minutes in the PM. Community Transit’s peak ridership is up 3% with improved travel times for most routes.

Initially, express lanes were tolled at all hours. In a concession to tolling opponents in the Legislature, that was pared back earlier this year so tolls now apply only between 5am and 7pm weekdays. The lanes are open to all drivers at other times, although center HOV ramps in Bellevue and Totem Lake are HOV/transit only when tolled access is not available.

Travel times for drivers in the general purpose lanes are generally better than before, particularly southbound. In the northbound direction, traffic flows more freely through Bellevue and Kirkland. But this has exacerbated a bottleneck at SR 522 in Bothell, where five lanes (2 HOT + 3 GP) converge into three (1 HOT + 2 GP). The highway remains congested until near I-5. Nearly 1,000 vehicles an hour merge onto I-405 at Canyon Park in the PM peak, adding to delays.

Continue reading “I-405 Tolls Fund More Highway Capacity”

New Riders in ST3

Link Morning Commuters at Westlake. Image by Oran.
Link Morning Commuters at Westlake. Image by Oran.

The completion of the Sound Transit 2 plan will more than double Sound Transit’s ridership from about 150 thousand today to 350 thousand, and ST3 will nearly double that again to between 561 and 695 thousand daily riders.

The ST3 plan would result in 657 to 797 thousand daily transit riders in the region in 2040. Bench-marked against a ‘no-build’ alternative, however, only 9% of those would be new to transit. Opponents of the measure repeat this factoid to argue ST3 will be ineffective in increasing transit mode share in the region, that it’s a poor value for money, and that it will not relieve congestion. Torture the data point enough, and it seems to yield a ludicrously high cost per added transit rider. But it’s a misleading number in several ways.

‘Cost per new rider’ is recognized as a terrible measure of value. The FTA discarded the measure in 2003 for a more comprehensive measure of system user benefits that includes travel time saved by all users. ‘Cost per new rider’ devalues the experience of existing riders and the time-saving and other benefits that accrue to them. Hundreds of thousands of riders will have a faster, more comfortable and more reliable journey.

Would anybody assess the value of a new highway only by counting new drivers? No. Any analysis of highway benefits would include time and money savings for all users, and so it is with transit. A focus on new riders also penalizes investments in core transit corridors (exactly where high-capacity transit needs to be). Providing alternatives to driving are important, but getting some people out of cars is not the only benefit of ST3.

Less obviously, the ‘no-build’ alternative is not the status quo. It is a highly optimistic 2040 scenario that incorporates all the long range plans of other transportation agencies and regional planners. The PSRC, WSDOT, Metro, and other transit provider plans are all completed whether currently funded or not. In this alternative world, bus service is far more ubiquitous and faster than today, and traffic is better managed to keep those buses moving reliably.

Why construct the ‘no-build’ this way? It maintains consistency between Sound Transit planning assumptions and the plans of all other agencies. But the assumptions underlying the ‘no-build’ scenario set a high benchmark that make rail benefits look smaller:

  • In the ‘no-build’ alternative, drivers face per-mile fees across the region to manage traffic levels. With better-managed traffic levels, buses move faster.
  • Travel times in HOV lanes are well-managed by raising HOV requirements as high as necessary for reliable transit speeds, or converting HOV lanes to bus only lanes. The political will to make these changes is uncertain, and not currently in evidence.
  • The ‘no-build’ alternative also assumes the complete build-out of WSDOT plans, many of which are currently unfunded.
  • Other transit agencies are assumed to complete their long range plans. Concurrent with the PSRC’s Transportation 2040 plan, the ‘no-build’ includes a doubling of local transit service. Those are only partly funded. The funding gap grows if ST3 is not completed and local agencies have to pick up the workload of the ST3 rail network.

In short, the no-build alternative isn’t free. It assumes large unfunded investments by other agencies, and those costs will grow if Sound Transit cannot build out the rail network after 2023.

Play out, if you will, an alternative where ST3 does not pass. Suppose other transit agencies are incompletely funded, or the political will for tolling and per-mile driver fees falters. In this very plausible scenario, failure to pass ST3 will reduce transit ridership by much more than 9%. In a world where buses are not faster or more reliable than today, the advantages of grade-separated rail are greater, and ridership gains are correspondingly larger.

Bellevue Chooses Development over View Corridors

Bellevue's City Hall
Bellevue’s City Hall. The protected views would have been from the balcony and a public area inside.

Last month, Zach explained how a view of Mount Rainier from Bellevue City Hall had become a roadblock to rezoning of several redevelopable sites near the East Main Link station. Last week, the Bellevue City Council voted 5-1 to not retain the view corridor. While the rezoning process is not over, this decision makes it much more likely that the East Main station walk-shed will support much higher development densities.

Bellevue is engaged in several rezoning efforts. The East Main Citizens Advisory Committee (CAC) is reviewing the area immediately adjacent to the East Main station. The Downtown Livability CAC has made recommendations for areas which include the Sheraton site northeast of East Main, and most directly within City Hall’s view of Mount Rainier.

The goals around the station are commendably ambitious. Current height limits of 75-90 feet may be increased up to 200 feet at the Sheraton site, and up to 300 feet on lots to the south (including the Red Lion across from the station). The current FAR of 3.0 on the Sheraton site, and just 0.5 further south, would increase up to 5.0.

Bellevue City Council Chambers, and an adjacent balcony and interior concourse, enjoy a view of Mount Rainier over these sites. Current zoning doesn’t allow buildings tall enough to impinge on those views, but preserving the view would require that portions of the Sheraton site in the view corridor be built up to no more than 91 to 117 feet, and portions of the Red Lion site be no taller than 123-148 feet.

Council Members opposed to mandating a view corridor cited the detrimental impact to likely development. Kevin Wallace, in an earlier meeting, described the view corridor as “extremely close to a regulatory taking” because it had not been considered before developers began planning for the site.

Continue reading “Bellevue Chooses Development over View Corridors”

ST3 Must Include a Provisional Light Rail Extension into Kirkland

A two-mile rail connection to Kirkland would connect all the major cities on the central Eastside in ST3.
A two-mile rail connection to Kirkland would connect all the major cities of the central Eastside in ST3.

The debate leading up to the adoption of the ST3 draft system plan on March 24 was politically fraught on the Eastside. After Sound Transit and the City of Kirkland failed to reach agreement on use of the Eastside Rail Corridor, the Board elected to build neither rail nor BRT on the corridor in Kirkland. Since then, however, Kirkland has worked with Board Members on a rail extension from Bellevue to South Kirkland. The ST3 program also includes a study of future high-capacity transit through Kirkland, leading to a record of decision.

Rail to South Kirkland has changed the calculus around future transit in Kirkland. The environmental study is, strictly speaking, flexible with respect to both mode and alignment. But the starting point of a rail station at South Kirkland makes it almost inevitable that ST4 will include a rail extension into Kirkland and onward to Totem Lake.

With light rail to Kirkland more inevitable than ever, why stop short in ST3? A mere two-mile extension would bring rail to 6th St, serving the fast-growing Google campus which is expected to grow to several thousand employees. It would be within walking distance of other fast-growing employers in downtown Kirkland.

Sound Transit must add a provisional project on the Eastside to extend the rail line into Kirkland.

Some have pointed out, accurately, that the ST3 package includes significant investments in Kirkland. Nevertheless, transit users are understandably unenthusiastic. South Kirkland falls short of the major centers in Kirkland where most riders access transit.

Won’t Save-our-Trail challenge a rail extension? Save-our-Trail is opposed to the South Kirkland station and any environmental study of transit on the corridor. So their opposition is inevitable either way. Meanwhile, the narrowness of their support has become obvious. Public comment on the draft plan from Kirkland was overwhelmingly pro-rail, and Save-our-Trail were unable to solicit more than a dozen opposing comments despite an intensive campaign.

Neighbors and users of the trail are not well-served by political uncertainty or delays in extending transit. The earliest possible design work on compatible transit will deliver certainty, allowing the trail to be developed without the risk of later relocation or disruption.

Kirkland has a successful urban core that is the envy of many growth centers that will see transit investments in ST3. Had the political process played out more agreeably, Kirkland would have been connected to the high-capacity transit network in ST3.

Please let the Sound Transit Board and your Council members know they must finish the rail line to Kirkland.

How Much to Invest in I-405 BRT

Sound Transit has agreed to add a BRT stop with 200 surface parking stalls at NE 44th in Renton

After Sound Transit released the draft system plan in March, some Eastside cities were unhappy it included a smaller investment in I-405 BRT than they had sought. Bellevue and Renton pushed for something closer to the “intensive capital” BRT with more parking and more stations using express toll lanes.

Some Eastside cities penned a joint letter, describing the proposal as comparable to ST Express service with improved headways, and demanding a much larger investment with more inline stops to create a BRT that is “the equivalent of light rail on rubber tires”. The attempt to forge a coalition of the I-405 corridor cities fell flat. Several East and South King cities did not sign. Some who signed were small cities that do not border I-405. None of the Snohomish County cities participated.

The amended system plan made some concessions. Sound Transit had agreed in March to relocate Renton’s downtown transit center to a more freeway-accessible location with 700 parking stalls. Renton pushed to expand the new South Renton transit center to accommodate 2,000 cars, and to add a second BRT stop at NE 44th St with parking for another 700. While the Board agreed only to 200 parking stalls in a surface lot at NE 44th St, the added center-line direct access facility adds $170 million to the cost of the BRT. An even more remote station with expanded parking at SE 112th in Bellevue was not included. Kirkland, taking a different approach, negotiated for more TOD in Kingsgate, reducing by 200 the planned parking expansion there.

I-405 BRT had lots of institutional momentum. The master plan for I-405, approved in 2002, envisions a BRT line with inline stations along I-405. To this end, Sound Transit has built transit centers and center ramps to the HOV lanes. WSDoT has created the express toll lanes north of Bellevue where buses could move reliably. With WSDoT now funded to extend the express lanes to the south, many observers expected a large investment in BRT on the corridor in ST3.

The plan ran up against uncomfortably low ridership numbers. Modelling suggests only 12,000 riders in 2040, and that the ridership isn’t increased at higher investment levels. A pared-down BRT, much of which runs in general traffic lanes, attracts as many riders as the ‘Cadillac’ version.

Recognizing that the proposal for higher investment levels didn’t stand up to close scrutiny, the Sound Transit Board in March advanced a draft system plan with just $735 million in capital investments, less than any of the options considered in the 2014 corridor studies. The low capital plan leveraged existing highway infrastructure with better and more frequent buses. Where center stations already exist, the BRT would run in the ETL lanes. Elsewhere, buses would run in general purpose lanes (or on the shoulder in a few locations north of Bothell).

Continue reading “How Much to Invest in I-405 BRT”

Our Improbable Growth Targets

Regional projections indicate a sharp slowing in Seattle and Bellevue, while Tacoma and Everett accelerate.
Regional projections indicate a sharp slowing of growth in Seattle and Bellevue, while Tacoma and Everett accelerate (year 2000 population=100%).

Recent Census data showed another year of strong growth in Seattle and Bellevue. Everett and Tacoma grew more slowly. This raised a familiar question: why are regional plans so out of step with recent experience? Seattle grew 2 1/2 times faster than either Everett or Tacoma in the last five years. Bellevue and other cities on the Central Eastside are also developing quickly. What would cause a reversal of these trends so that Tacoma and Everett can grow into their ambitious 2040 goals?

Regional growth plans are a mix of forecasting and policy-making. The State Office of Financial Management produces state and county forecasts. OFM population forecasts determine targets for housing growth, which are apportioned between cities by PSRC and county planning processes. In each county, the largest ‘Metropolitan’ cities (Seattle, Bellevue, Tacoma and Everett) are allocated a portion of the anticipated growth. Other cities are allocated lesser shares of expected growth, as are unincorporated areas within the Urban Growth Area (UGA). Few unincorporated urban areas remain within King County, but many fast-growing suburbs in Pierce and Snohomish are unincorporated. Lower targets are set for rural areas outside the urban boundary.

The median housing target sets the floor for zoned capacity. Cities and Counties must zone for sufficient developable capacity. Some cities zone for greater capacity than required; others do the minimum to stay in compliance. Much planned development is within Regional Growth Centers.

Benchmarking recent data against the PSRC’s Land Use Vision puts the forecasts in context.

Pierce and Snohomish Counties have grown faster than King for decades. But King County recovered more quickly from the recession. Maybe it’s premature to conclude the ‘normal’ suburban growth norm won’t reassert itself. But other center cities in the US are also outpacing their suburbs. If the flight to the suburbs is really over, should we expect King to lag its neighbors in the future?

State forecasts are for Pierce and Snohomish County to outpace King, in a reversion to historical trends of faster growth in the suburbs
State forecasts are for Pierce and Snohomish County to outpace King, in a reversion to historical norms of faster growth in the suburbs.

King County, having recently outpaced forecasts with urban-focused growth, is expected to revert to the mean. Some of the reversion is just bureaucratic inertia as complex multi-jurisdictional planning processes play catch-up. The 2040 forecast implies a slowdown across King County with just 0.55% average growth over the next 25 years. That compares unfavorably to the 1.85% average countywide, and 2.4% in Seattle, observed over the last five years. This slow pace would restore the past balance between the counties.

Growth is to slow slightly in Pierce and Snohomish, but will outpace King County. Pierce and Snohomish planners are predicting dramatic changes in how their counties grow.

Continue reading “Our Improbable Growth Targets”

Another Year of Rapid Growth

Seattle and Bellevue continue to outpace regional growth targets
Seattle and Bellevue continue to outpace regional growth targets

Last week, the US Census Bureau released 2015 population estimates by city. To nobody’s surprise, Seattle continues to grow rapidly, having added 15,300 more residents in the year ending June 2015. Seattle has grown by 74,000 residents (12.1%) in just five years. Seattle, for the third year in a row, is among the five fastest growing cities in the nation. Seattle, with 684,000 residents last year, is now the 18th largest city, overtaking El Paso and Detroit.

Seattle’s growth was 44% of the 34,800 residents added in King County in 2015, or 41% of the 179,400 added in King County since 2010.

Among cities larger than 50 thousand population, only Bellevue (+2.4%) and Marysville (+2.5%) grew faster than Seattle (+2.3%) last year. None have grown faster than Seattle over five years. (A few smaller exurban communities have posted higher growth rates).

Bellevue added 3,200 residents in 2015, bolstering its role as a major employment center for the Eastside. Tacoma added 3,300. Everett added 1,200. Nine other cities added over 1,000 residents, including Issaquah which saw a 5.8% growth spurt and almost 2,000 new residents.

Renton, growing more slowly, nevertheless saw its population exceed 100,000, becoming the sixth city in the region to reach this milestone.

Continue reading “Another Year of Rapid Growth”