Torchlight Parade Re-routes and Shuttle from Queen Anne

Members of the 1000+ Chinese drill team, the only one of its kind in the US
Members of the 1000+ Chinese drill team, the only one of its kind in the US

Just when you thought it was safe to travel again, the Seafair Torchlight Parade has arrived. Yes, 4th Ave will be closed all evening from 3:30 pm to 10 pm, and 38 34 bus routes will be re-routed. These include routes C, D, E, 1, 2, 3, 4, 7, 8, 10, 11, 12, 13, 16, 21, 24, 26, 28, 33, 36, 40, 43, 47, 49, 66, 70, 99, 120, 125, 131, 132, and ST Express routes 512, 522, 545, and 554, 577, 578, and 594.

Metro will also be operating a shuttle every 20 minutes between Nob Hill on Queen Anne, and Queen Anne Ave and Mercer St, by the Seattle Center, from 3:30 pm to midnight, with frequent stops between the termini.

For those wishing to get across the parade route, use this nifty little map of all the accessible tunnel corridors throughout downtown. Westlake Station is my favorite shortcut under 4th Ave street closures. You can grab the fold-out version of this map at Westlake Station.

For the unaware, the Torchlight Parade is a big deal. Thousands of spectators claim spots along the street with fold-up chairs hours before the parade. Over 150,000 apectators are expected to show up. Sounders fans, whose game against the LA Galaxy got moved to Monday night, will be showing up in force as World Cup heroes Clint Dempsey and DeAndre Yedlin serve as Grand Marshalls. Mariners fans will also get to show up this time, as their game today is at 1 pm, instead of the usual 7 pm.

Downtown Seattle isn’t the only location where Seafair will be stressing the public transit system. Renton River Days will impact 10 bus routes serving downtown Renton, including routes F, 101, 105, 106, 107, 148, 169, 240, 908, and 909.

Metro and Sound Transit each have alert services to which you can subscribe.

Addendum: Sound Transit Express routes 512, 577, 578, and 594 are also on re-route until 10:00 pm downtown.

8 comments

The Case for Express Cascades Trains

Cascades at Kelso (WSDOT Photo)
Cascades at Kelso (WSDOT Photo)

Until its peak year in 2011, Amtrak Cascades had been an unqualified success story, with strong and growing ridership and ever-higher farebox recovery ratios. It seemed like exceeding 1 million annual passengers and achieving near-profitability was right around the corner.  Well, new challenges have arisen and Cascades has begun to struggle modestly, resulting in a small but growing funding problem.

Despite being showered with nearly $800m in capital money by the 2009 stimulus package, the federal contribution to operational funding was cut in 2013 as mandated by the Passenger Rail Improvement and Investment Act of 2008 (PRIIA). In a feat of brilliantly backwards federal thinking, PRIIA committed the feds to divest from the most successful Amtrak lines (corridors under 750 miles) while continuing to fund the least successful (those over 750 miles). Such a mandate placed operational funding primarily in the hands of an even more recalcitrant body, the Washington State Legislature, which has shown little interest in achieving anything beyond what is mandated by the stimulus funding (two more Seattle-Portland trains), much less the Long Range Plan.

Cascades Farebox Recovery
Chart from WSDOT’s 2013 Amtrak Cascades Performance Report

Over the past two years, farebox recovery has fallen from 66% to 59%, with the squeeze coming both from stagnating revenue and operating costs that continue to rise by $1m per year despite no added service. Ridership has declined in each of the past 3 years, albeit modestly, from an all-time high of 848,000 in 2011 to 807,000 last year. The lost ridership can likely be attributed to competition from Bolt Bus in the Seattle, Portland, Bellingham, Vancouver, and Eugene markets, and also from worsened speed and reliability from construction that is intended to address both issues. Continue reading “The Case for Express Cascades Trains”

| 125 comments

Sound Transit Selects BNSF site in Bellevue as Preferred Alternative for Rail Yard

The Sound Transit Board voted yesterday to recommend building a 25-acre rail yard in Bellevue near the Spring District real estate development in the Bel-Red Corridor.

Sound Transit looks to triple their current light rail fleet from 62 to 180, as well as expanding their light-rail system from 16 to 50 miles. Because of the projected growth, a new maintenance facility is needed to go along with the current facility in the Sodo neighborhood, as the latter is expected to reach its full capacity by 2020.

The BNSF site in Bellevue’s Bel-Red corridor west of 120th Avenue NE was among the four sites that Sound Transit narrowed down in the draft Environmental Impact Statement (EIS) completed in May. The other sites considered were in Lynnwood and two other Bellevue locations, with one being adjacent to the SR-520 and the other being a modified version of the BNSF site. Detailed version of the site map for the original BNSF site can be found here.

Courtesy of Sound Transit
Courtesy of Sound Transit

The EIS considered a number of factors to measure the impact that would be left by the new light rail operations base including: noise and vibration; land use; visual and economic impacts; social, neighborhood, and social service impacts; and, impacts to parklands, open spaces, and other natural resources.

Continue reading “Sound Transit Selects BNSF site in Bellevue as Preferred Alternative for Rail Yard”

| 91 comments

News Roundup: To Blame

SounderBruce/Flickr

This is an open thread.

84 comments

In Summary: The Long Range Plan

The Vision
The Vision

Seattle Subway’s Comments on the Sound Transit Long Range Plan Update Draft Supplemental EIS

This is the final post in a series we’ve been doing related to Sound Transit’s Long Range Plan Update Draft Supplemental Environmental Impact Statement (“DSEIS”). The comment period is over on Monday, so be sure to get your comments in to LongRangePlan@soundtransit.org before the deadline comes. This post calls out conflicts between the goals of the LRP and its content.  If you want to skip the wonkiness but agree that we should push for the best quality rail system possible for future lines in the region, you can copy our comments and send them to Sound Transit in support.

Sound Transit uses its Long-Range Plan to identify and select corridors and technologies for future transit packages. We are currently in the comment period for the Long-Range Plan Update, which means there is an opportunity to give feedback to Sound Transit in regards to the big picture. Sound Transit last updated this document in 2005, four years prior to Central Link opening, and it shows. Sound Transit must review decisions that were made in its early days and are still affecting its direction now, as Seattle and the region have changed a lot in the 15 years since Sound Transit’s inception. We will frame our comments in the context of  Sound Transit’s DSEIS’s Goals and Objectives for their Long-Range Plan (page 1-5).

Section 1: “Provide a public high-capacity transportation system that helps ensure long-term mobility, connectivity, and convenience for residents of the central Puget Sound region for generations to come”

  • “Increase the percentage of people using transit for all trips”
  • “Provide effective and efficient alternatives to travel on congested roadways”

Grade separation provides the most efficient and effective way to move people. It eliminates interference from other traffic and maximizes transit’s speed. Grade separation is a true alternative to congested roadways. The higher speed and frequency that a grade separated system enables creates the greatest increase in ridership as well. This, combined with the fact that nearly all of the 55 miles of lines Sound Transit is currently building are grade separated, make the following section of the LRP DSEIS out of place:

Continue reading “In Summary: The Long Range Plan”

| 117 comments

Better Eastside Rail

As the Puget Sound region continues to grow, excellent transit connections between Eastside communities will be crucial.  The quality of transit options available to those communities will shape the safety, convenience and environmental quality possible for their residents and workers. Our vision for rail service to Issaquah would create new connections from Issaquah through Bellevue to Kirkland, would improve trips bound for Downtown Seattle, and would dramatically improve access between the I-90 corridor and North Seattle.

Issaquah Rail Map Continue reading “Better Eastside Rail”

| 184 comments

County Council Passes September Service Cuts

SounderBruce/Flickr

On Monday, the King County Council unanimously passed an ordinance enacting Metro bus service cuts for September 2014. There are press releases from Transportation, Economy, and Environment (TrEE) Committee Chair Rod Dembowski, the four other Democrats on the county council, and King County Executive Dow Constantine:

“This agreement adheres to the principles I insisted on many weeks ago: Don’t rely on money we don’t have; don’t spend one-time money for on-going service; and use objective criteria to make decisions on saving or cutting service,” said Executive Constantine. “I want to thank members for arriving at legislation that balances Metro’s budget, and that is sustainable.” 

The TrEE Committee passed the ordinance unanimously last Tuesday. In a sign of continued tension, Councilmember Dave Upthegrove had some interesting things to say about the process:

“I want to thank the Executive and Chair Phillips for working on a proposal that I could at least hold my nose and vote for,” said Councilmember Dave Upthegrove. “It took a little longer than everyone hoped, but I am pleased that the current ‘Majority Coalition’ decided to vote for the same proposal today that they rejected yesterday. I’m not sure what caused them to change their minds, but I am grateful that the Executive and Council Chair brought this proposal to us yesterday and that it is finally moving forward.”

The just-approved ordinance allows Metro to move forward with 161,000 hours of specified cuts in annual bus service hours in September. The council also approved, in principle, allowing Metro to cut another 188,000 annual hours in February of 2015. However, those cuts, including the specific routes, will need further council action.

The prior dispute involved several issues, including using one-time funding sources to temporarily shore up the operating budget and various deviations from Metro’s service guidelines. A main argument was whether to approve the February cuts now or wait for the next budget forecast. The compromise is that the Council agreed to the overall level of February cuts, but not the specific route adjustments, at this time.

Metro is still planning for another 200,000 hours of cuts in June and September of 2015, based on current revenue projections, but the Council will handle that in a later budget process.

Other than the 161,000 hours of cuts in September, these numbers do not take into account the impact if Seattle voters pass the proposal for a Seattle-only revenue package to avoid bus service cuts in Seattle.

16 comments

Let’s Build Rail to West Seattle (Option A6)

Let’s get this on the table right up front: West Seattle should receive a light rail line in the next Sound Transit funding package (ST3). STB has covered this issue before with articles about possibilities, options presented, and even the hazards of regionalism. What might actually be included in the next regional package, and how does the study presentation impact the ST board’s decision? We think that a better presentation of the information contained within this study would serve the Sound Transit board and West Seattle well when it comes time to select corridors for ST3. As currently presented, the study makes the West Seattle line appear less cost effective than it should be. Seattle Subway has some suggestions to improve this.

As others have noted, this study is comprehensive to the point of being difficult to comprehend, and contains routes and options that cost more than $8 billion and are well beyond what the region will build in near future. We have two main requests to help make this information easier to understand and analyze.

1.  Option “A6”

Map by Oran.
Map by Oran.

Continue reading “Let’s Build Rail to West Seattle (Option A6)”

| 108 comments

The Tolling Discussion is Impoverished

Dulles Toll Plaza (wikimedia)

The idea that tolling is some insidious stealth tax, or a fundamental violation of the inalienable right to drive anywhere, for free, with unlimited subsidy is a well-established cancer on the Puget Sound’s discourse. Nevertheless, I was astonished at the boundaries of the 520 tolling debate, as presented by Ellis Conklin in the Seattle Weekly last week and Alexa Vaughn in The Seattle Times ($) yesterday:

Had [they been notified], then perhaps there may have been a possibility of allowing motorists to drive for free across the 520 floating bridge – at least the idea would have been broached in a meeting of the seven commissioners.

****
PCC Logistics, for example, relies on westbound truckers to deliver goods on time to its Port of Seattle facility. The company handles import, export, refrigerated and general cargo for customers.

Even though its trucks will be rerouting, Beth Sanchez, the company’s customer-service manager, says that the company is still warning customers that there could be long and unpredictable delivery delays….

Companies and workers will also have to deal with the costs of extra gas and, if using the westbound 520 bridge, the tolls. The state has no plans to waive or reduce tolls for crossing 520 and will be allowing intermittent openings for boats.

The decision to not reduce tolls for those traveling westbound has angered some daily bridge-crossers.

Why, if only there was some way to make sure 520 would be uncongested, so that freight and other businesses that depend on reliable travel could do so!

The debate as presented in these two reporters — and, to be fair, as framed by Washington State officials who are either unimaginative or muzzled — is basically that it would be great if we could grind 520 to a halt too by lifting the toll, but shucks, we still have to pay for the bridge.

This is absurd. Spending hundreds of millions of dollars to expand our highway capacity and “ease congestion” does massive damage to the environment and ends up inducing the same congestion. But in that debate, the establishment wrings its hands about the economy and the need to move freight around, because time is money. When maintenance dramatically reduces highway capacity, however, no one cares enough about businesses to do the one thing that might help.

I agree that freight operators, the handyman with his tools, and so on need uncongested highways. And because shorter trips on the highway feed directly into their bottom line, tolls are but a fraction of the cost of sitting in traffic because there’s no alternative. The answer, if policymakers really care about businesses like PCC Logistics, is not to suspend the toll but raise the toll to whatever level keeps 520 free-flowing this week.

As an added bonus, the really poor people — that would be the ones on the bus — also benefit from normal operating speeds. In fact, anyone interested in a fast and inexpensive option would naturally gravitate to the choices that consume the least scarce road space, which benefits everyone.

44 comments